Document Page: First | Prev | Next | All | Image | This Release | Search
File: 081296_jul96_decls40_0008.txt
Subject: NBC DEFENSE TO 2D BDE 1ST ID OPORD 11 91
Box ID: BX001016
Document Number: 107
Folder Title: SPOT REPORTS AND BDE COMMAND INSPECTION
Folder Seq #: 222
Unit: 1ST ID
Parent Organzation: VII CORPS
UNCLASSIFIED
4. The 2-4 person stretcher crew at station 2, meanwhile, is
preparing a stretcher with a patient wrap on it at the "hot
line." When the crew from station 1 is -Finished7 they re -decon
their hands and lower arms and carry the patient to the stretcher
that the number 2 station has prepared.
S.- The "hot line" is meant to be a combination Iiquid/vapor
contamination control line. The crew from station. no. I is
responsible for completely deconning the casualty before moving
him to the clean stretcher. At no time will the station no. I
crew step over the "hot line" and they will stay from it.as much
as possible.
6. Just before the 2-4 man crew at station no. 2 carries the
patient to the treatmen t area, a station no.1 soldier takes off
the protective mask of the patient.
7. Station no. 1 soldiers then redecon their hands and go to get
another casualty.
S. There are 2 station no. I's because the procedures there take
at least twice as long to accomplish.
. . .........
9. For an extra assurance that contamination is not spread
across the "hot line," construct a shuffle pit for the station
no. 1 soldiers to walk through as they pass the casualty to the
clean side. It should be bigger than the area that the station
no. I soldiers must stand in to pass the casualty over to station
2. Perhaps 5 ft. X 8 ft. The shuffle pit should contain: I
part water, 2 parts Super Tropical Bleach (STB), and 3 parts
sand.
10. A box of trash bags is neccessary to collect.up all the
equipment after the operation unless it is buried.
Am
UNCLASSIFIED
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 9 f:/Week-26/BX001016/SPOT REPORTS AND BDE COMMAND INSPECTION/nbc defense to 2d bde 1st id opord 11 91:08099611162575
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001016
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = SPOT REPORTS AND BDE COMMAND INSPECTION
Folder Seq # = 222
Subject = NBC DEFENSE TO 2D BDE 1ST ID OPORD 11 91
Document Seq # = 75
Document Date =
Scan Date = 03-JUL-1996
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 09-AUG-1996