Document Page: First | Prev | Next | All | Image | This Release | Search
File: 970725_dec96_decls29_0023.txt
Subject = COMMAND CHRONOLOGY 11TH MARINES 13 MAR 91
Parent Organization = SECDEF
Unit = HQMC
Folder Title = 11TH MARINES COMMAND CHRONOLOGY JAN FEB 91 SEC 1 OF 2
Document Number = 1
Box ID = BX600135
UNCLASSIFIED'
Conducted a staff briefing of the artillery
support of offensive operations.
19 Feb 1991 Operation Desert Storm Ground Attack Day
Minus Five (S-5). Ilth Marines units
continued to move forward to occupy positions
near the southwest corner of the Saudi-Kuwait
border. Ilth Marines engineers began
preparing revetted and bermed positions near
the border to be Occupied by the -Firing
batteries, regimental and battalion command
posts, and logistics trains. Battery "E" 2/12
conducted two separate artillery raids as part
of TF Troy +iring 110 rounds of HE and
destroying several buildings and outposts
tjith secondary explosions reported. Other
specific noteworthy events included:
0615: E/2/12 OCCUPIED FIRING POSITION AT GRID OS 805 510 TO
CONDUCT ARTILLERY RAID ON ENEMY COMPOUND. PLAN CALLED
FOR BATTERY TO MARK TARGET FOR AIR, BUT LIMITED
VISIBILITY PREVENTED AIR ATTACK. BATTERY FIRED 40
ROUNDS HE DELAY AT 0627 DESTROYING BUILDINGS IN THE
ENEMY COMPOUND AT US 809 607 WITH NUMEROUS SECONDARY
EXPLOSIONS REPORTED. BATTERY DISPLACED AT 0835 TO
RETURN TO ITS ASSEMBLY AREA POSITION.
1235: 5/11 OCCUPIED POSITIONS IN ASSEMBLY AREA NEAR GRID
QS 52 49; MISSION GENERAL SUPPORT (OS).
1440: E/2/12 RECEIVED FRAGMENTARY ORDER (FRAGO) FROM TF TROY
TO CONDUCT RAID ON POLICE POST ACROSS BORDER AT 1530.
BATTERY IMMEDIATELY DISPLACED AND OCCUPIED FIRING
POSITION AT GRID TM 102 506 AT 1610. BATTERY FIRED 70
ROUNDS OF HE AT 1714 ON TWO OBSERVATION POSTS AT GRIDS
TM 171 606 AND TM 179 609, DESTROYING SUILDINGS WITH
SECONDARY EXPLOSIONS REPORTED. BATTERY DISPLACED AT 1715
AND REOCCUPIED ASSEMBLY AREA POSITION.
2008: 3/12 COMPLETED OCCUPATION OF FIRING POSITIONS AT GRID
OS 54 62; MISSION DIRECT SUPPORT (DS) TF GRIZZLY.
20 Feb 1991 Operation Desert Storm G-4. Ilth Marines
units continued to move forward into assembly
areas in preparation for the ground offensive.
The engineer effort continued to prepare
improved positions near the border. Specific
noteworthy events included:
1030: VERBAL FRAGO ISSUED TO 1/12 TO DISPLACE TO VICINITY GRID
QS 73 51 IN ORDER TO SUPPORT TF TARO SCREENING AND
INFILTRATION OPERATIONS.
ENCLOSURE (1)
UNCLASSIFIED
Document Page: First | Prev | Next | All | Image | This Release | Search