Document Page: First | Prev | Next | All | Image | This Release | Search
File: 970101_jul96_decls6_0001.txt
Subject: DESERT SHIELD STORM AFTER ACTION REPORT PHASE 1
Unit: 1ST ID
Parent Organization: VII CORPS
Box ID: BX001045
Folder Title: AFTER ACTION REPORTS PHASE I MOBILIZATION AND DEPLOYMENT
Document Number: 2002
Folder Seq #: 16
NO CLASSIFICATION
06/:iS/91
JULLS LOOO REPORT
1. (U) JULLS NURGCR: 4f657-413Ei9 (664:16), Submitted by RILEY
AFZN-PTM-C, Mr. Walter, 856-2225, (913)239-2225.
2. (U) Operation DESERT SHIELD conducted by USCENTCOH an 02/11/91.
3. C ) KEYWORDS: EXEC SUM.
4. (U) TITLE: SUMMARY - Phase I - Post Chemical Officer Ref Ist ID
(M) Units
5. (U) Executive Summary -For Post Chemical Officer:
a. PLANNING: Guidance for NBC Operations was published in
Annex 0, OPLAN Lexicon Danger.
(1) The annex required commanders to conduct
predeployment checks of unit NBC equipment and to identify and
requisition unit CDE shortages. It also specified procedures
for drawing, packing and deploying installation stocks of CDE,
and for drawing Nerve Agent Antidote Kits (NAAK) and
pretreatment (PB) tablets. It further specified mandatory
individual training, guidelines for moving radioactive materials
and instructions for surface shipments of decontaminants.
(2) The key to successfully planning And implementing
each deployment phase was that the Post Chemical Office
established effective liaison with lst ID (M) units and other
installation activities early in the process. This liaison
permitted the quick resolution of CDE issues. It also enhanced
the distribution of NBC-related info as the Post Chemical Office
indexed numerous intelligence messages for review and later
screened, edited, and disseminated unclassified NBC logistics
traffic.
us or changing NBC logistics guidance created
problems -For Ist ID (M) units. Changing serviceability criteria
for the Battledress Overgarment (BDO) and Chemical Protective
Overgarment (CPO) ( older model) caused uncertainty among troops
and decreased their confidence in the suit. FORSCOM did not
clarify its guidance regarding the composition of the second
required chemical suit ensemble until the beginning of
Operation DESERT STORM.
b. PREPARATION FOR DEPLOYMENT. The timely identification
and solution of problems characterized the preparation phase.
The time available to prepare (Aug - Oct 90) allowed thorough
preparation.
(1) The Fort Riley NBC logistics regulation required
units to submit quarterly NBC inventories and sizing data before
Desert Shield. Since the reports were not taken seriously,
decisions regarding the proper use of funds to fill CDE
NO CLASSIFICATION
II-32
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 6 f:/Week-27/BX001045/AFTER ACTION REPORTS PHASE I MOBILIZATION AND DEPLOYMENT/desert shield storm after action report phase 1:12269616084844
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-27
Box ID = BX001045
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = AFTER ACTION REPORTS PHASE I MOBILIZATION AND DEPLOYMENT
Folder Seq # = 16
Subject = DESERT SHIELD STORM AFTER ACTION REPORT PHASE 1
Document Seq # = 2002
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 26-DEC-1996