         SUBJECT: MlAl and M2A2 Bradley NET


                  (3) After vehicles have been deprocessed, they are
         inventoried and hand receipted at the port, then HET'D to the NET
         sites. There will be two NET sites, one at Sultan Range and one
         at Faisal Range. We will need parking areas +or new vehicles,
         classroom space +or tank and Bradley vehicle crews, a maintenance
         building and a mess hall. All can be prefab. G3 Training should
         design the facilty. They will ultimately benefit both range
         complexes. During NET, they will be used intensely. There will
         be a new battalion undergoing net at each range every 8 days for
         a total of 56 days at Sultan Range and 40 days at Faisal Range.
         This dual range effort is necessary even though it will result in
         an additional requirement for NET tank crew evaluators and
         Bradley crew evaluators. NET duration becomes critical. If each
         company takes three days instead of two, NET +or all of Ist Cav
         Div at Sultan Range would take a total of 84 days. For tank
         crews, the most important part of NET is -Firing. For Bradley
         crews, the most important part of NET is maintenance.

                  (4) We anticipate a need -For level hardstand. This
         could be crushed rock. Given the other priorities, this will be
         tough to do using organic engineers. We should ask for HO DA
         funding if possible. It is necessary to teach people how to use
         their new equipment in the best possible environment. There must
         be enough track park space to park 80 tanks or Bradleys at Sultan
         and 60 tanks or Bradleys at Faisal. We need space for a
         battalion maintenance area at each range as well. 24 ID (M) has
         a good design idea.

                  (5) The range design would work -for either tank or
         Bradley. Tanks must calibrate, Bradleys should zero. We
 modified Table VII for both. This would incorporate
         50% offense and 50% defense tasks. We need SAAB Targets and some
         berms must be built.


                  (6) Ammunition required   would be:

                      - MIAI        5rounds calibration
                                  16 rounds TPDST
                                    6rounds TPT
                                 200 rounds .50 cal 4 and I
                                  200 rounds 7.62 4 and I

                      - M2A:f"    12 rounds zero
                                  64 rounds TPT
                                  32 rounds TPDST
                                  200 rounds 4 and 1 coax



                                            6

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 53 f:/Week-13/BX000002/DUTY LOG MAIN CP G3 20 OCT 90/daily staff journal log:0823961435301
Control Fields 17
File Room = apr96_declassified
File Cabinet = Week-13
Box ID = BX000002
Unit = XVIII CORPS
Parent Organization = ARCENT
Folder Title = DUTY LOG MAIN CP G3 20 OCT 90
Folder Seq # = 56
Subject = DAILY STAFF JOURNAL LOG
Document Seq # = 1
Document Date =
Scan Date = 05-APR-1996
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 23-AUG-1996