                      VACCINE ACQUISITION PORTION OF DAB PREPARATION - STATUS REPORT

               OVERVIEW OF VPF AND SIGNIFICANT VACCINE ISSUES PAPER.
                      ANNA AND I ARE PREPARING A SHORT PAPER (3-4 PAGES) ELUCIDATING
               POTENTIAL ISSUES AFFECTING VPF AND VACCINE PROCUREMENT PROGRAM. INITIAL
               PAPER WILL COVER ALL VPF OVERSIGHT ISSUES AND BE BROAD ENOUGH TO COVER THE
               SITE, DESIGN AND SPECIAL AREAS WITHIN THE EA. FINAL PRODUCT WILL COVER ISSUES
               OUTSIDE OF THOSE COVERED BY EA. WE WILL ALSO BE OVERSEEING (EVERY OTHER DAY
               ) THE EA WORK TO ASSURE WE STAY ON TRACK. @ WILL PUT TOGETHER AN ISSUES
               SLIDE IF NECESSARY.


               ECONOMIC ANALYSIS
                     SAIC IS CO        0 TO GATHER OPERATIONAL DATA AND INFORMATIONON
               BDRP RELATED VACCINE PRODUC77ON FROM GOVERNMENT CONTRACTORS, FDA, AND
               MM. THEY HAVE A TIGHT PRODUCTION SCHEDULE BUT WILL HAVE A SUMMARY FOR
               INCLUSION INTO THE BLUE BOOK AND VG BY COB 7 JAN AND COMPLETED REPORT COB
               17 JAN CONTRACT COST IS $205K DUE TO THE OUTSIDE CONSULTANTS BROUGHT INTO
               THE PROJECT AND ADDED COST OF INDIRECT SAIC PERSONNEL.

               SITE SELECTION ECONOMIC ANALYSIS
                     THIS IS BEING COMPLETED BY THE COPP OF ENGINEERS, BALTIMORE DISTRICT.
               THEY ARE BEHIND SCHEDULE BY APPROXIMATELY ONE WEEK. I TOLD THEIR HQ POC
               ,LARRY DULANY, THAT WE EXPECTED HIM TO HEAD UP PREPARING A SHORT (ONE PAGE)
               EXECUTIVE SUMMARY, ON THE S17E SELECTION WITH A VG FOR THE DAB BY 7 JANUARY.
               HE ASSURED ME IT WOULD BE DONE. HE BELIEVES THE SITE EA WILL BE COMPLETE BY
               MID JANUARY ALSO (rr WAS MY UNDERSTANDING IT WAS TO BE FINISHED BY 30 DEC AS
               OFF 2 WEEKS AGO).

               35% CONCEPT AND DESIGN
                     MEETING BEING HELD 13 AND 14 DEC TO REVIEW /CORRECT AND DISCREPANCIES
 QUESTION REGARDING 35% COMPLETION PROJECT. COMPETED STUDY DUE
               TO HPFA 30 DEC. HPFA (LTC SIMMONS) WILL PROVIDE AN EXECUTIVE SUMMARY AND
               TWO VGS, ONE SCHEDULE AND ONE ON FUNDING BREAKOUT FIRST JAWUARY. WE CAN
               CONDENSE AS NECESSARY.


               CURRENT STATUS OF VACCINE PR
                     MAJOR KLENKE IS PREPARJNG AN EXECUTIVE SUMMARY AND ONE SLIDE ON
               STOCKAGE AND FUNDING FOR SPECEFIC VACCINES FROM FY94 through FYOI. THIS SHOULD
               BE READY BEFORE CIOUSTMAS.


               JIM AND I WILL CONDENSE SLIDES AS NECESSARY.

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 10 f:/Week-36/BX003203/BIOLOGICAL DEFENSE VACCINE PRODUCTION FACILITY/biological defense vaccine production facility:11259610130813
Control Fields 17
File Room = sep96_declassified
File Cabinet = Week-36
Box ID = BX003203
Unit = OTSG
Parent Organization = HSC
Folder Title = BIOLOGICAL DEFENSE VACCINE PRODUCTION FACILITY
Folder Seq # = 66
Subject = BIOLOGICAL DEFENSE VACCINE PRODUCTION FACILITY
Document Seq # = 1
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 25-NOV-1996