Document Page: First | Prev | Next | All | Image | This Release | Search
File: 120396_oct96_decls13_0004.txt
Subject: COMMAND CHRONOLOGY FOR THE PERIOD 1 TO 31 JAN 91
Unit: 2ND AA BN
Parent Organization: 2 MAR DIV
Box ID: BX600017
Folder Title: COMMAND CHRONOLOGY 2ND ASSAULT AMPHIBIAN BATTALION JAN - FEB 1991
Document Number: 5
Folder SEQ #: 27
UNCLASSIFIED
Part II
Narrative Summary
Command, Operations and Training
During the first month of Calender Year 1991, the 2d Assault
Amphibian Battalion operated in support of 2d Marine Division. Th is
period began with the completion of troop movements from Camp Lejeune
to Saudi Arabia. Upon arrival, operations and training immediately
commenced at a fast pace.
A delay involving the Follow on Echelon (FOE) of equipment caused
serious training and operational problems. This delay seriously
degraded the battalion's capabilities both in the short and long
term. The short term effect was insufficient quantities of equipment
to support desert training and the on hand equipment received
premature and excessive wear and tear. Additionally, when the FOE
began to arrive, operational commitments prevented full preparation
of the equipment. Camouflage green equipment arrived and was put
into service without the benefit of Desert Camouflage. The long term
effect of the delay of the FOE, was a disparity in training. Two
companies had equipment with which to train. Two others waited
several weeks for equipment to arrive and could not train as
extensively.
An intensive NBC Defense training package concentrated on
training individual Marines. Each Marine was trained in an enhanced
version of Individual Survival Measures (ISM) and in decontamination
techniques for personnel and equipment. Sustainment in MOPP gear and
first aid measures in a chemical environment were particularly
stressed. In addition, company decon teams received refresher
training in PDS/EDS techniques. Company level decon assets were
Marines in the battalion were brought up
to the standards required for forces operating in a NBC environment.
Personnel and Administration
Battalion Deployment to SWA and the subsequent passing of operational
control of four AAV companies and the General Engineer Support Unit
to the manuever Regiments resulted in the following:
1. Pay rosters and LES's are delinquent, resulting in potential
morale problems. Pay information for January 1, 1991 is still
unavailable. Discrepancies, allotments and pay status questions that
individuals are concerned with are still unanswered.
UNCLASSIFIED
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 8 f:/Week-42/BX600017/COMMAND CHRONOLOGY 2ND ASSAULT AMPHIBIAN BATTALION JAN - FEB 1991/command chronology for the period 1 to 31 jan 91:11129615130115
Control Fields 17
File Room = oct96_declassified
File Cabinet = Week-42
Box ID = BX600017
Unit = 2ND AA BN
Parent Organization = 2 MAR DIV
Folder Title = COMMAND CHRONOLOGY 2ND ASSAULT AMPHIBIAN BATTALION JAN - FEB 1991
Folder Seq # = 27
Subject = COMMAND CHRONOLOGY FOR THE PERIOD 1 TO 31 JAN 91
Document Seq # = 5
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 12-NOV-1996