Document Page: First | Prev | Next | All | Image | This Release | Search
File: 100796_guid_010.txt
PRIORITY *~ UNCLASSIFIED -.
BASE COMMUNICATIONS CENTER
390 COSO/DONA
PAGE ie OF 12 RHIPAAA 2313 23'1352Z
REOUIREMENTS, THE COMPONENT SHALL NOTIFY MEAPO AND ARRANGE FOR
TRANSFER BACr: TO THE OWNER.
(4) (U) UPON REOUEST, MEAPO SHALL MArE AVAILABLE THE INITIAL
CONDITION SURVEY FOR THE PROPERTY (LISTS THE CONDITION OF THE
PROPERTY WHEN IT WAS LEASED).
(5) (U) THE COMPONENT SHALL NOTIFY MEAPO WHEN THE PROPERTY IS
PREPARED FOR TRANSFER. FOR PROPERTY LEASED BY MEAPO, THE
COMPONENT ENGINEER1 THE OWNER, THE UNIT COMMANDER AND A MEAPO
REPRESENTATIVE SHALL CONDUCT A JOINT INSPECTION OF THE PROPERTY.
FOR PROPERTY LEASED BY THE MODA, A MODA REPRESENTATIVE SHALL BE
INCLUDED IN THE INSPECTION. THE RESULTS OF THIS INSPECTION SHALL
BE DOCUMENTED BY MEAPO. A COPY OF THE INITIAL CONDITION AND
POST-USE CONDITION SURVEY SHALL BE PROVIDED TO THE COMPONENT FOR
APPROPRIATE ACTION. A COPY OF THE INITIAL CONDITION AND POST-USE
CONDITION SURVEYS SHALL ALSO BE PROVIDED TO MODA.
(6) (U) TERMINATION OF REAL ESTATE LEASES.
(A) (U) FOR PROPERTIES LEASED BY MEAPO, MEAPO SHALL EFFECT THE
TERMINATION OF THE LEASE AND TRANSFER OF THE PROPERTY BACI< TO THE
OWNER.
(B) (U) FOR PROPERTIES LEASED BY MODA AND FOR PROPERTIES WHOSE
LEASE HAS BEEN TRANSFERRED TO THE KINGDOM OF SAUDI ARABIA, MODA
SHALL EFFECT TERMINATION OF THE LEASE AND TRANSFER OF THE
PROPERTY BACK TO THE OWNER.
* D. (U) HOST NATION PROVIDED REAL ESTATE. FACILITIES PROVIDED IN
* KIND OR CONSTRUCTED WITH HN FUNDS WILL BE RETURNED TO THE HOST
NATION WHEN USE IS NO LONGER REOUIRED. THE OCCUPYING COMPONENT
WILL COORDINATE RETURN OF THE FACILITIES WITH THE LOCAL HN
REPRESENTATIVE.
E. (U) ENVIRONMENTAL.
(I) (U) COMUSARCENT REMAINS THE PRIMARY AGENT FOR ENVIRONMENTAL
PROTECTION PLANS AND POLICY.
(2) (U) COMUSARCENT WILL EVALUATE EXISTING ARRANGEMENTS/CONTRACTS
FOR THE COLLECTION, STORAGE AND DISPOSITION OF HAZARDOUS WASTES
AND DETERMINE IF THEY ARE ADEOUATE OR MUST BE REPLACED BY THE
THEATER HAZARDOUS WASTE DISPOSAL CONTRACT. WHERE PROCEDURES HAVE
NOT BEEN DEVELOPED, COMPONENTS WILL CONTINUE TO COLLECT AND STORE
HAZARDOUS MATERIALS AND COORDINATE DISPOSAL WITH COMUSARCENT.
(3) (U) COMPONENTS WILL ENSURE SUBORDINATE UNITS CONTINUE TO
EXERCISE DUE REGARD FOR PROTECTING THE ENVIRONMENT.
F. (U) CLEAN-UP OF FACILITIES.
(I) (U) COMPONENTS WILL ENSURE CLEAN-UP OF ALL FACILITIES
OCCUPIED OR UTILIZED BY SUBORDINATE UNITS, INCLUDING DESERT BASE
CAMPS. COORDINATE WITH LOCAL HOST NATION REPRESENTATIVES AS
REOUIRED.
(2) (U) BERMS CONSTRUCTED TO DELINEATE BOUNDARIES OF DESERT BASE
CAMPS AND FOR OTHER USES, SUCH AS AROUND POL BLADDERS, NEED NOT
BE FLATTENED UNLESS THEY CREATE A HAZARD. TANK DITCHES AND OTHER
OBSTACLES WHICH COULD INJURE INNOCENT CIVILIANS WILL BE FILLED-
IN/CLEARED.
G. (U) TEMPORARY STRUCTURES.
(I) (U) THIS SECTION APPLIES ONLY TO THOSE STRUCTURES PURCHASED
FOR DESERT SHIELD/DESERT STORM WITH OTHER THAN SERVICE O&M FUNDS.
(2) (U) TENSION FABRIC STRUCTURES.
(A) `~` TROOP CONSTRUCTED TENSION FABRIC STRUCTURES WILL BE USED
TO THE MAXIMUM EXTENT POSSIBLE TO SUPPORT REDEPLOYMENT FACILITY
REOUl REMENTS.
(B) (U) WHEN NO LONGER REOUIRED, STRUCTURES WILL BE DISASSEMBLED,
INVENTORIED, CLEANED, AND PACKAGED FOR USE IN FUTURE EXERCISES
AND/OR CONTINGENCIES.
(C) (U) UNLESS OTHERWISE DIRECTED, COMPONENTS WILL BE RESPONSIBLE
BT
*23 15
NNNN
SECTION 6 OF 7
FOR IN-THEATER STORAGE OF TENSION FABRIC STRUCTURES IN THEIR
POSSESSION AT TIME OF EXECUTION OF THIS OPLAN AND ANY ADDITIONAL
UNCLASSIFIED
~ESiIW
` ~~~!~~r. .+, ~~I L ~~:~~t .,wq:r~~,~ `~~~`ma%tE~.*%~~:~~t:~~~~ea.~~-*~~ *~~-~-11,,,,,~~.~~~.**~~. *. * - * -
Document Page: First | Prev | Next | All | Image | This Release | Search