Document Page: First | Prev | Next | All | Image | This Release | Search

File: 100796_guid_009.txt
Page: 009
Total Pages: 12

PRIORITY                                                                  UNCLASSIFIED

                           BASE COMMUNICATIONS CENTER
                                    390 COSO/DONA

             PAGE ~9 OF  12   RHIPAAA 2313                                                                            23.'! 352Z
             ARCENT.
             (3)  (U) MSRS.
             (A)  ~) ESTABLISHED THEATER MSRS WILL BE USED FOR REDEPLOYM~NT OF
             UNITS TO THEIR ASSIGNED TACTICAL ASSEMBLY AREAS                                            (TAA),
             REDEPLOYMENT ASSEMBLY AREAS                                   (RAA)1        AND FINAL STAGING AREAS.
             MOVEMENT OVER MSRS WILL BE CONTROLLED BY THE THEATER ARMY
             MOVEMENT CONTROL AGENCY                                   (MCA).
             (B)  (C) HOST NATION RAIL SYSTEM WILL BE USED TO THE MAXIMUM
             BT
             `12317
             NNNN


             f~pfl~T
             SECTION 5 OF 7
             EXTENT POSSIBLE FOR THE RETROGRADE OF SUSTAINMENT CARGOES FROM
             FORWARD LOCATIONS, WHERE FEASIBLE.
             (C)  (C) PROCEDURES OUTLINED IN THE FOLLOWING USCENTCOM APPROVED
             POLICIES AND PROCEDURES WILL REMAIN IN EFFECT:                                            U. S. FORCES
             PROCEDURES FOR HIGHWAY CLEARANCE REQUESTS,                                           DTD ~ DEC 9~  (ARCENT);
             HIGHWAY REGULATION PLAN/TRAFFIC CIRCULATION PLAN,                                           3RD EDITION,
             bTD 12 JAN91   (HOS 318TH MCA);.AND THEATER MOVEMENT CONTROL
             PROCEDURES,  DTD 2 NOV 91                                  (ARCENT).
             10.  (U) CIVIL ENGINEERING SUPPORT PLAN                                          (CESP~.   (SEE ALSO PARA 4B
             OF BASIC ORDER).
             A.  (U) GENERAL.
             (I)  (U) THE COMMANDER IN CHIEF,                                 U. S.        CENTRAL COMMAND   (USCINCCENT)
             OR DESIGNATED REPRESENTATIVE REMAINS THE THEATER WARTIME
             CONSTRUCTION MANAGER  (TWCM)                                 RESPONSIBLE FOR COORDINATING
             REDEPLOYMENT CONSTRUCTION REQUIREMENTS.                                           THE REGIONAL CONTINGENCY
             CONSTRUCTION MANAGEMENT                                   (RCCM) ORGANIZATION,         WITH LNO' S FROM EACH
             COMPONENT WILL R~MAIN IN-PLACE UNTIL REDEPLOYMENT CONSTRUCTION
             COORDINATION REQUIREMENTS ARE MET.
             (2)  (U) CIVIL ENGINEERING SUPPORT TO REDEPLOYING FORCES WILL
             REMAIN AUSTERE.  ADDITIONAL CONSTRUCTION PROJECTS TO SUPPORT
             REDEPLOYMENT WILL CONTINUE TO BE SUBMITTED IN ACCORDANCE WITH THE
             COMPONENT PROJECT PROCESSING GUIDE.                                           PROCEDURES FOR REQUESTING
             LEASED FACILITIES REMAIN THE SAME.
             B.  (U) SCOPE-LIMITATIONS.
             (I)  (U) USE EXISTING OR LEASED FACILITIES TO THE MAXIMUM EXTENT
             POSSIBLE.
             (2)  (U) EXPEDITE IDENTIFICATION OF ONGOING AND PROGRAMMED
             CONSTRUCTION PROJECTS AND EQUIPMENT PURCHASE/RENTAL CONTRACTS
             WHICH MAY BE CANCELED, TERMINATED OR REDUCED IN SCOPE.
             USCINCCENT CCJ4 MESSAGE 27l~0eZFEB9l APPLIES.
             (3)  (U~ CONSTRUCT ADDITIONAL FACILITIES TO INITIAL STANDARDS.
             (4)  (U) RECOVER PORTABLE LATRINES,                                         SHOWERS,  AND WASHSTANDS FOR
             FURTHER USE.
             (5)  (U) RECOVER SERVICEABLE CONSTRUCTION MATERIALS TO THE MAXIMUM
             EXTENT POSSIBLE TO SUPPORT REDEPLOYMENT.
             (6)  (U) PROVIDE TROOP CONSTRUCTION ASSISTANCE FOR REDEPLOYMENT
             ACTIVITIES, AS REQUIRED.
             (7) ~BE PREPARED TO PROVIDE TROOP CONSTRUCTION ASSISTANCE TO
             ESTABLISH INTERIM FACILITIES FOR PREPOSITIONING.
             C.  (U) LEASED REAL ESTATE.
             (I)  (U) REAL PROPERTY LEASES SHALL BE TERMINATED AND THE PROPERTY
             TRANSFERRED BACK TO THE OWNER.                                   THE U. S.        ARMY CORPS OF ENGINEERS
             MIDDLE EAST/AFRICA PROJECTS OFFICE                                          (MEAPO),  THROUGH USARCENT, IS
             THE EXECUTIVE AGENT FOR REAL ESTATE TRANSACTIONS.
             (2) (U) COMPONENTS SHALL BE ACCOUNTABLE FOR ALL EQUIPMENT AND
             FURNISHINGS SUPPLIED WITH REAL ESTATE LEASED FOR SUBORDINATE
             UNITS, AND FOR DAMAGES ABOVE AND BEYOND FAIR WEAR AND TEAR IN
             ACCORDANCE WITH THE TERMS OF THE SPECIFIC LEASE.                                            COMPONENTS WILL
             FUND ALL RESTORATION COSTS.
             (3) (U) COMPONENTS SHALL COORDINATE THE TERMINATION OF LEASES FOR
             REAL ESTATE IN USE BY SUBORDINATE UNITS.                                            THE INTENT IS FOR THE
             COMPONENTS TO REDISTRIBUTE LEASED PROPERTY AMONG SUBORDINATE
             UNITS TO PRECLUDE THE REQUIREMENT FOR NEW LEASES.                                           UPON
             DETERMINATION THAT THE LEASED PROPERTY IS EXCESS TO COMPONENT


                                                                        UNCLASSIFIED
                                                                        ~E~GiI~~
~.~~.: -~.   .. r..i:~ ~. ~~::~~ :~` ~-. r.~i.~.,~~..~<;,~,,~.~~~~....  .--~--.-- -. ..-....


Document Page: First | Prev | Next | All | Image | This Release | Search