Document Page: First | Prev | Next | All | Image | This Release | Search

File: 980226_aug96_sagwi1_0038.txt
Page: 0038
Total Pages: 59

Box ID = BX000472

Folder Title = COMMAND REPORTING FILES- OPERATION ORDERS-PLANS                                                 

Unit = ARCENT      

Parent Org = CENTCOM     






        @'XIIIUIT 6 TO TAB A TO APPENDIX 8 TO ANNEX D TO USARCENT

        ENGINEER DATA SECTION

        1. PURPOSE. To provide USARCENT with a status report on
              Ea-
        subsur ce water sources and critical runway and main supply
        route repair actions. Status report will be used to determine
        requirements, if any, for USARCENT assistance required.

        2. REPORT CONTEST.

        ENGINEER DATA ("as of" Date/Time).

            a. NEW WATER SOURCES. (Note 2)

        LOCATION/TYP.E SOURCE
        (with_cl@@id no.)     GALLONS PER HOUR (GPH) SOURCER (USA/MOST)

            b. RUNWAY REPAIR.      (Note 3)

                 LOCATION       SHORTFALL         I14PACT      REMARKS

            c. MAIN SUPPLY ROUTE REPAIR. (Note    4)

                 LOCATION       SHORTFALL         IMPACT       REMARKS

            d. NARRATIVE (Optional). (Note 5)

        3. NOTES.

        Note 1. Report should be as of the same day and time as the
        LOGSTAT Report. If it is the same, state "same." If it is not
        the same, indicate date and time of data.

        Note 2. Identify completed or newly found subsurface sources.

        Note 3. Report only critical capability shortfalls, the
        impact, and corrective actions taken/needed.

        Note 4. Report only capability shortfalls, the impact, and
        corrective actions taken/needed.

        Note 5. Optional narrative provides commanders the opportunity
        to advise USARCENT of problems, impact, and action(s) requested
        of USARCE.NT, if any











                                     D-13-A-6-1

Document Page: First | Prev | Next | All | Image | This Release | Search