@'XIIIUIT 6 TO TAB A TO APPENDIX 8 TO ANNEX D TO USARCENT
ENGINEER DATA SECTION
1. PURPOSE. To provide USARCENT with a status report on
Ea-
subsur ce water sources and critical runway and main supply
route repair actions. Status report will be used to determine
requirements, if any, for USARCENT assistance required.
2. REPORT CONTEST.
ENGINEER DATA ("as of" Date/Time).
a. NEW WATER SOURCES. (Note 2)
LOCATION/TYP.E SOURCE
(with_cl@@id no.) GALLONS PER HOUR (GPH) SOURCER (USA/MOST)
b. RUNWAY REPAIR. (Note 3)
LOCATION SHORTFALL I14PACT REMARKS
c. MAIN SUPPLY ROUTE REPAIR. (Note 4)
LOCATION SHORTFALL IMPACT REMARKS
d. NARRATIVE (Optional). (Note 5)
3. NOTES.
Note 1. Report should be as of the same day and time as the
LOGSTAT Report. If it is the same, state "same." If it is not
the same, indicate date and time of data.
Note 2. Identify completed or newly found subsurface sources.
Note 3. Report only critical capability shortfalls, the
impact, and corrective actions taken/needed.
Note 4. Report only capability shortfalls, the impact, and
corrective actions taken/needed.
Note 5. Optional narrative provides commanders the opportunity
to advise USARCENT of problems, impact, and action(s) requested
of USARCE.NT, if any
D-13-A-6-1