Document Page: First | Prev | Next | All | Image | This Release | Search
File: 980226_aug96_sagwi1_0036.txt
Box ID = BX000472
Folder Title = COMMAND REPORTING FILES- OPERATION ORDERS-PLANS
Unit = ARCENT
Parent Org = CENTCOM
e.. NARRATIVL (Optional): (Note 10)
3. NOTES.
Note 1. Location report should be as of the same day and time
as the LUGSTAT Report. If it is the same, state "same." if
it's not the same, indicate date and time of data.
Note 2. A coordinated logistic/personnel staff input.
indicate in parenthesis significant near term population
changes.
Note 3. Outline briefly current situation, status of
termitial/pipeline operations (if applicable), and planned
actions for the next 5 days.
Note 4. identify any existing or potential significant
sustainment problems. If problem(s) noted, specify anticipated
mission impact, status of corrective action (to include
estimated get-well date), and assistance needed, if any.
Continue to report on status daily until each problem is
satisfactorily resolved. If there are no problems, state
.#none."
Note 5. Calculate storage capacity and balance on hand for
water in organizational bulk water storage devices; i.e., stave
tanks, bladders, onion tanks, etc. (more than 500 gal
capacity). Round to the nearest thousand gallons.
Note 6. Show location's average water consumption factor
(gallons per person per day). Factor should be based upon
comparison of estimate of daily water consumed with record of
daily population supported.
Note 7. Calculate days of supply (DOS) by comparing the
quantity of water on hand with the estimated consumption of the
projected population to be supported. If the projected
population changes significantly each day, the on-hand balance
should be compared successively to each day's estimated
consumption figure rather than to a single, unchanging daily
consumption estimate.
Note 8. Considering anticipated changes in sourcing,
production, storage, distribution, or consumption and projected
changes in population, maintenance, and operations, state if
water status is considered satisfactory or unsatisfactory for
the next 5-day period. Impact should be addressed in
paragraphs 2a(3) and 2a(4), as required.
Note 9. For each operating location, list nomenclature and
quantity of organizational water purification, storage,
distribution, and chiller equipment that is available. (At
joint service operating locations, units should list only their
own equipment and not that of other services, who will be
D-B-A-5-2
Document Page: First | Prev | Next | All | Image | This Release | Search