Document Page: First | Prev | Next | All | Image | This Release | Search

File: 090496_jul96_decls7_0001.txt
Page: 0001
Total Pages: 2

Subject: MEDICAL AND CHEMICAL DEFENSE INDIVIDUAL ISSUE ITEMS             

Box  ID: BX000450

Document Number:         22

Folder Title: DUTY LOG  G-3  11-12 OCT 90                                                                     

Folder Seq #:         11

Unit: ARCENT      

Parent Organzation: CENTCOM     









       PRIORITY                      U N C L A S 5 I F I E                        4 0430



       PAAUZYIJW RHCBAM06016  2840429-ULIULI--RHTPAAA.
       ZNR LJUUUUXXXTXIKIXXX:Zxxxxxxxxx:xxxxz
       P.102115Z OCT 90
       F@ CIN      FORT MCPHERS(3N C3E, //FC,33-CAT//
       TO ATG 987xz=r9
       Alo 9163.
       AT.0
       INF5PORI36/C6R USAMMA FT 13ETRICK MD //SGMMA-RMM//
       RU;4TNFA/Cr)R USAHSC FT SAM HOUSTON TX //HSI-O//
       RUEA13WD/HQr)A WASHINGTON DC //r)ASG-HCL/r3ASO-HCO//                       7TR
       ST                                                                         @Lf
       UNCLAS33                                                                    0 @A
       OPER/E)ESERT SHIELD//                                                        SC-?
       MSOID/SYS.RRM/FORSCOM FCM]3//
       AMPN/'MUBJ: MARK I,'NERVE AGENT ANTIDOTE KIT (NAAK)//
       RgF/A/MSC'3/FCME)/0915OOZSEP90//                                            OP/0
       AMPN/SIIBJ: MEDICAL AND CHEMICAL IIEFENSE INDIVIDUAL ISSUE ITEMS//
       FZT:F/B/RMr3/FCJ3-CAT/P-7070OZ-F.P90/
       AMPN/SUB-3: NERVE AGENT ANTT130TE KIT//
       RMKS/I. THE US ARMY MEDICAL MATERIEL AGENCY HAS ADVISED THAT THERE
       I-= A TEMPORARY SHORTAGE OF MARK I NAAK IN THE SUPPLY SYSTEM. THIS
       SHORTAGE SHOULD BE RESOLVED WITH THE RECEIPT OF APPROXIMATELY 130.090



       PAGE 02 RHCOAM06018 UNCLAS
       MARK I NAAK FROM THE MANUFACTURER ON OR ABOUT 21 OCTOBER AND F
       RECEIPTS SCHEDULED IN NOVEMBER.
       2. HEALTH SERVICES COMMAND HAS REDISTRIBUTED FROM ON HAND ASSETS
       APPROXIMATELY 40.000 MARK I TO MOBSTA TO INSURE UNITS CAN BE
       VALIDATED PRIOR TO DEPLOYMENT.
       3. ASSISTANCE IS REQUIRED BY UNITS AND MOBSTA IN CAREFUL PLANNING
       WHEN REQUISITIONING AND RECEIVING THESE ITEMS. REQUISITIONS ARE
       BEING SUBMITTED FOR BULK REQUIREMENTS BY MOBSTA FOR ALL UNITS
       13EPLOYING FROM THAT INSTALLATION. AS A RESULT WHEN SHORATOES OCCUR
PSC CAN
       SPLIT SHIPMENTS TO MOBSTA IN AN EFFORT TO ENSURE THAT EARLIEST
       DEPLOYING UNITS ARE RECEIVING THE FIRST SHIPMENTS. UNTIL ADEQUATE
       STOCKS ARE ON HAND IN THE WHOLESALE SLIPPI.Y SYSTEM MOBSTA AND IMSA
       SHOULD CONSIDER SUBMITTING SEPARATE REQUISITIONS FOR EARLY AND LATER
       DEPLOYING UNITS. HIGH PRIORITY (1, 2, 3) REQUISITIONS CAN AND SHOULD
       89 SUBMITTED FOR EACH. MOBSTA WILL COORDINATE WITH SUPPORTING IMSA
       IN DETERMINING PRIORITY. REQUISITION PROJECT CODE 9BU WILL BE USED
       FOR UNITS DEPLOYING IN LESS THGN 14 J36YS. PROJECT COIIE EYY WILL BE
       USE13 FOR UNITS DEPLOYING IN 14 DAYS OR MORE.
       4. AS PREVIOUSLY STATED THE SHORTAGE OF MARK I NAAK II TEMPORARY




       PAGE 03 RHCGAM06018 UNCLAS
       AND SHOULD BE RESOLVED WITHIN THE NEXT 60 DAYS. UNTIL THAT TIME



       PRIORITY               x      U N C L A 5 S I F I E D



 L

Document Page: First | Prev | Next | All | Image | This Release | Search