Document Page: First | Prev | Next | All | Image | This Release | Search

File: 073096_jun_decls3_0010.txt
Page: 0010
Total Pages: 35

Subject: DAILY COMMANDER SITREP                                          

Box  ID: BX000213

Document Number:          4

Folder Title: SITUATION REPORTS  7TH ENG BDE  22 DEC 90- 10 APR 91                                            

Folder Seq #:          1

Unit: VII CORPS   

Parent Organzation: ARCENT      








                    (4) Class III (P) oil is readily available at LOCT BASE
           E. Bde needs several hundred gallons of 15w-40 and at least 1500
           gallons o@ 10@v 'In order 'lo commence operations.

                    (5) One battalion arrived from CONUS with 0 out of 92
           authorized XY-5'1 (Vinson) secure devices. The brigade has been
           allotted 25 Vi-,-igon f-pora e@,pected deliveries to Corps, but needs
           at least 75 to meet ininirau@-ft secure voice requirements. Request
           50 additional KY-57s.

                    ( ) Some attains are combat ineffective due to lack
           of aiiiinunlltiori: ',gth En En (attached to 1 AD) and 527th En Br,).
           No              or, engineer munitions are aliailabl.e at LOC-
           BASE E.  Request iiir@iiediste assistance.

                    f@7) Request assistance in solving problems involving
           receipt of LESS. Same 7@lh Engineer Dpigade units have yet to
           receive their December and January            @@pigade has previously
           submitted list of all assigned units, but has 'thus far received
           only LESs fop organic, Brigade         lxo@ii F'(3.

                    (8) We have to @set definite answers on package mail flow
           after G-Day. I  It will be almost inoossibl-e for brigade to receive
           and transport package mail to units after C7-Day. Although Corps
           OPLAN stated package mail woul@d cease, sources indicated packages
           may continue to flow to EWA.

                    19) Two sets of M-'g @.at'uing are available at Dani@iafti
           part. Need high priority to have @ia@,tl'n6, @@pansported forward.
           Matting is required to construct a forward C130 Airstrip.

                    (10) 7th Engineer Brigade requests three well
           development ki'uo from theater assets fop use on projected water
           points within Iraq.
                           I

mply with anti fratricide
           guidance to place VF 17 panel, markers on vehicles due to
           shortages. 'Rp,"d,ade has ordered 5,000 -:iarkers through C7-4. Time
           is running out.

           2. @IciC S-3, 7th Engineer '@rigade.





                                             RAI@TEc-'
                                             co-l@







                                              2

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 35 f:/Week-24/BX000213/SITUATION REPORTS 7TH ENG BDE 22 DEC 90- 10 APR 91/daily commander sitrep:07269614225918
Control Fields 17
File Room = jun96_declassified
File Cabinet = Week-24
Box ID = BX000213
Unit = VII CORPS
Parent Organization = ARCENT
Folder Title = SITUATION REPORTS 7TH ENG BDE 22 DEC 90- 10 APR 91
Folder Seq # = 1
Subject = DAILY COMMANDER SITREP
Document Seq # = 18
Document Date =
Scan Date = 25-JUN-1996
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 26-JUL-1996