Document Page: First | Prev | Next | All | Image | This Release | Search

File: 011696_75_1_001.txt
Page: 001
Total Pages: 2







    ROU'RINE                              8 6 G R ra T                 TOD     036 2228


    RNASZYUW RUDCEKM3300   0362EOiR-SSSS--RUDCEKM.
    ZNY SSSSS
    R 06091it SAN Ji
    FM COMUSARCENT MAIN//Ga-NB8//
    TO AIi3 11742
    RHSIMCU/CDRUSARCENT CP//G3/NBC//
    INFO RHCGSRS/USARCENT REAR FT MCPHERSON GR//CAC//
    BT
    S- E G R 9 T
    SUBJ- PROTECTIVff MAsR@R;r-Al)-fN-ESS (U).,
              THIS MESSAGE IS-A RETRAN  B OF SECRET MSS 101345Z JAN 91,
    USCINCCENT, CCJ3, SAB. QUOTE
    i@L4+r,+ A DEPOT LEVEL MAINTENANCE /REPAIR FACILITY BEGAN OPERATIONS
    AT DAMMAM ON 11 DEC 90. FACILITY CAN IDENTIFY UNSERVICEABLE MASKS
    IRW PRODUCTION ACCEPTANCE LEVEL TEST/STANDARDS, AND REPAIR AS MANY OF
    THESE ASSETS AS POSSIBLE FOR THEATER RESERVE STOCKAGE. INITIALLY, A
    RELATIVELY LARGE PERCENT OF THE M17-SERIES MASKS TESTED HAD ONE OR
    MORE POTENTIALLY LIFE - THREATENING LEAK PATHS. BECAUSE THE ACTUAL
    HISTORY AND SOURCE OF THE INDIVIDUAL MASKS THAT FAILED COULD NOT BE
    FULLY DETERMINEDT WE ASKED HO AMCCOM TO INVESTIGATE AND DETERMINE
    THE VALIDITY OF THE TEST STANDARDS, AND THE READINESS IMPACTS
    RELATING TO PROTECTION OF OUR SOLDIERS.
    2(,L4@    DURING THE PERIOD 1-5 JAN 91, A HO AMCCOM TERM CONDUCTED



    PAGE 02 RUDCEKM3300              T                          I
    FIT/VALIDATION TESTS FOR APPROXIMATELY 354 SOLDIERS FROM TWO SEPARATE
    UNITS. TESTS WERE CONDUCTED WITH THE SOLDIERS WEARING THEIR
    INDIVIDUALLY ASSIGNED M17-SERIES MASK. PHASE ONE WAS A FIELDED
    FIT/VALIDATION TEST CONDUCTED BY THE UNIT NBC NCO USING AMYL-ACETATE
    (BANANA OIL). PHASE TWO INVOLVED THE USE OF THE XM41 FrT/VRLrDATION
    TEST DEVICE WHICH ATTACHED DIRECTLY TO THE DRINKING TUBE ASSEMBLY OF
    THE MASK. THIS PHASE IDENTIFIED ADDITIONAL FAILURES NOT FOUND WITH
    THE BANANA OIL. IF A FAILURE OCCURRED IN EITHER PHASE9 THE SOLDIER
    WAS DIRECTED TO PERFORM INDIVIDUAL LEVEL PREVENTIVE MAINTENANCE
    CHECKS AND SERVICES (PMCS) FOLLOWED BY RETESTING. THE TEAM FOUND
EN RESULTED FROM IMPROPER SIZING. UPON COMPLETION,
    ALL MASKS IN THE SURVEILLANCE TEST WERE HELD BY THE TEAM FOR
    FOL@OW-UP TESTS AND THE SOLDIERS WERE ISSUED NEW MASKS.
    @L'L@   TEST RESULTS INDICATED THAT OF THOSE MASKS WHICH FAILED THE
    FIT/VALIDATION TESTS9 90 PERCENT WERE DETECTED USING BANANA OIL. THE
    NUMBER OF MASK FAILURES WERE REDUCED BY NEARLY 50 PERCENT UPON
    COMPLETION OF PROPER PMCS. (NOTE: THE MAJORITY OF PROBLEMS WERE
    IMPROPERLY CLEANED OUTLET VALVE SEATS). UNITS TESTED REPORTED THATs
    IN MANY INSTANCES, PROPER SIZES OF MASKS (SMALL AND EXTRA SMALL) WERE
    NOT AVAILABLE AND THAT REPAIR PARTS SHORTAGES PRECLUDED PROPER PMCS.


                                                              p
                                                               ,EC.Wpt) UNRLASSIFIED ORDEFT
                                                              $EC ARMY By DAMH PE
    ROUTINE                                         T                DEC
                                                                                      54
Box ID = BX000000
Unit = G3 NBC SECTION  
Parent Organization = ARCENT          
Folder Title = MASK READINESS                                                                                  
Subject = PROTECTIVE MASK READINESS
Document Number =         75
Image file name = 00000059.tif

Document Page: First | Prev | Next | All | Image | This Release | Search