Document Page: First | Prev | Next | All | Image | This Release | Search

File: 011696_69_1_001.txt
Page: 001
Total Pages: 2







           AFRD-DTO                                             28 December 1990


           INFORMATION MEMORANDUM FOR The Chief of Staff

           STJBJECT: Mask Rework Operation (U)

           1. (U) A meeting was conducted 26 Dec 90 at the mask repair
           facility in Dhahran to ascertain the magnitude of the alleged mask
           unserviceability issue raised by XVIII Abn Corps.
                L(- I
           2         The Chemical Research, Development and Engineering Center
           (CRDEC) ;gill send a subject matter expert team to the in-country
           mask maintenance facility in early Jan 91. They will provide a
           quantitative assessment of M17 Protective Mask serviceability in
           two XVIII Abn Corps units. They will test a total of 340 masks in
           combat and combat support units. Mask fit will first be tested
           using the XM41 Mask ValiiYdtitYn Dev7i @@o determine if the soldier
           is achieving an adequate sea t4i-Eh--Che mask. The mask will then
           be tested with the M14 Mask Test I)eiFice@urrently being used in
           country to verify a@     repairs- .1 the-purpose of @he assessment is
           to demonstrate that masks may iail the M14 test, which measures
           production acceptance standards, but the mask provides adequate
           protection to the soldier under field conditions.

                 (U)   Results will be forwarded after completion of the
              ts.

                                                           @e@r @,7z- "3 6- '5@ic


                                            GLENN G. LACKEY
                                            COL, FA
                                            Chief, Operations Division
















                                                     IIECTRADED UNCLAR>SIFIED ORDER
                                                    SECAFIMYByi)AUH PE          4 4
                                                         DEC   7 fgg-;
Box ID = BX000000
Unit = G3 NBC SECTION  
Parent Organization = ARCENT          
Folder Title = MASK READINESS                                                                                  
Subject = Mask Rework Operation (U)
Document Number =         69
Image file name = 00000049.tif

Document Page: First | Prev | Next | All | Image | This Release | Search