Document Page: First | Prev | Next | All | Image | This Release | Search

File: 011696_66_1_001.txt
Page: 001
Total Pages: 1


                                                       uuwuuuuuuuuuuuuu
                                                       IJ UNCLASSIFIED IJ
                                                       uuuljuuuuuuljuuulju






                                                    RECETVED AT 21:28 Z


           IMMEDIATE                 RU


           OATUZYUW RUCIAr-874@@3 3492036-UUUU--RUDCHAA.
           ZNR UUUUU
           0 152022Z DEC 9c)
            / /AMSMC-Cr, / / A Akcr , Ax '(L,*Oio '3
           TO RHIVHAI/CDR XVIII ABN CORPS //DCG//
           RUDCHAA/COMUSARCENT MAIN //AFRD-CS//
           RUEADWD/DA WASHINGTON DC //DAMO-SWC//
           RUKLDAR/CDR AMC ALEX VA //AMCCN-DCG/AMCCN-DCGMR//
           RUCLBWA/COMDT USACMLS FT MCCLELLAN AL //ATZN-CM//
           RUFEPBA/CDR PBA PINE BLUFF AR //SMCPB-CO/i
           RUEDEKA/CDR CRDEC DOVER NJ //SMCCR-CD//
           ST
           UNCLAS (70-17D)
           SUBJ PROTECTIVE MASKS
           A. MSG (S)s CDR )(VIII ABN CORPS, DCGI 141355Z DEC 90s SAB
           1. WE ARE WELL AWARE OF FAILURE MECHANISMS OF THE M17 SERIES
           MASKS. IN FACT, A RED TEAM WAS FORMED TO STUDY A SEVERE USE
           PROBLEM WHICH RESULTED IN VOICEMITTER HOUSINS FAILURES. EXTENSIVE
           TESTING RESULTED IN IMPLEMENTATION OF REINFORCEMENT OF THE
           VOICEMITTER AREA ON ALL RECENTLY REBUILT ITEMS. FORTUNATELY, IT
           WAS CLEARLY SHOWN THAT LONG BEFORE THE MASK INTEGRITY WAS
           COMPROMISED9 THE ONSET OF THE FAILURES/CRACKS IS CLEARLY VISIBLE.
           PAGE 02 RUCIAFB7423 UNCLAS
           THE PRODUCTION ACCEPTANCE TEST EQUIPMENT USED BY THE IN-COUNTRY
           TEAM MEASURES AN ABSOLUTE PROTECTION FACTOR MUCH HIGHER THAN NEEDED
           FOR ADEQUATE SOLDIER PROTECTION. AN ADDITIONAL TESTER HAS RECENTLY
           BEEN MADE AVAILABLE TO THE TEAM TO DETERMINE IF THERE IS AN
           ADEQUATE DEGREE OF PROTECTION AFFORDED BY THE MASK. WE ARE
           ENCOURAGED TO FIND THAT MANY MASKS FAILING PRODUCTION ACCEPTANCE
, SHOWED MORE THAN ADEQUATE PROTECTION.
           THEREFORE9 WE DO NOT FEEL THAT YOU HAVE A SIGNIFICANT PROBLEM.
           HOWEVER, WE WILL CONTINUE TO EVALUATE DATA AS IT EMERGES.
           2. FOR NOW, WE NEED TO ASSESS WHERE WE ARE. TO THAT END, SENIOR
           SUBJECT MATTER EXPERTS WILL BE DISPATCHED TO ASCERTAIN THE MAGNITUDE
           OF THE PROBLEMs DEVELOP AN APPROPRIATE SURVEILLANCE PROGRAM, AND
           FUTURE COURSES OF ACTION.
               REQUEST FUTURE MSG TRAFFIC INCLUDE CDR CRDEC //SMCCR-CO// AND
           CDR CRDEC //SMCCR-TDP//.
           4. THIS MESSAGE HA.R R;r;rkt 13ISNED BY M(3 GREENBERG, C(3, AMCCOM.
           BT
           #7423









                                                          01 OF'OL
                                                       uuuuuuuuuuuuuuuu
                                                       I[ liki@1,NCCT=T;:n ii
Box ID = BX000000
Unit = G3 NBC SECTION  
Parent Organization = ARCENT          
Folder Title = MASK READINESS                                                                                  
Subject = PROTECTIVE MASKS
Document Number =         66
Image file name = 00000043.tif

Document Page: First | Prev | Next | All | Image | This Release | Search