Document Page: First | Prev | Next | All | Image | This Release | Search
File: 011696_48_1_001.txt
AFRD-DTO 25 December 1990
INFOR-YiA71ON MEMORANDUM FOR The Chief of Staff
SUBJECT: Mask Rework ODeration (U)
@7
1. On 14 Dec 90 the XVIII Abn CorDs message ARCENT, HQ DA,
AMC and the Chemical School that 44% of the M17 Protective Masks
tested at the in-coun@-ry repair facility failed the quality
assurance test.
2. @-he message equated this failure rate to Operation Rock
Ready where, in 1984, all M17 series masks were recalled. The
message has created considerable interest within the Chemical
community.
@i
3. @ MG Greenberg, Cdr, AL4CCOiM and BG Nydum, Cdr, Chemical
Research, DeveloDment, and Engineering Center (CRDEC) replied to
the XVI'.'I Abn @@ords message, Their messages stated 'that -,he
4-n-count.-y mask naintenance fac4l' @ uses test equipment designed
to conduct production acceptance ;nd rebuild testing, a level of
testing more stringent than that required for field protection.
While MG Greenberg does not feel a significant problem exists, he
has sent COL Gross, Deputy Cdr, ICRDEC) to investigate the matter.
LWI
COL Gross arrived in Riyadh 24 Dec 90 and in-briefed BG
A-@no:d on the purpose of his visit to ARCE'IT.
c (&I
5, A meeting will be conducted 26 Dec 90 at the mask repair
facility in Dhahran to ascertain the magnitude of the problem,
develop an appropriate surveillance program, and future courses of
action.
6, !U) Results of the meeting will be forwarded for your
information. If possible, BG Arnold will be out-briefed by COL
Gross.
GLENN' G. LACKEY
FA
Chief, Operations Division
RECRADED UNCL4r>SIFIED ORDER
8EC ARMY BY DAMH pE - 13.-
7 1995 0:3
r7
Box ID = BX000000
Unit = G3 NBC SECTION
Parent Organization = ARCENT
Folder Title = MASK READINESS
Subject = Mask Rework Operation
Document Number = 48
Image file name = 00000004.tif
Document Page: First | Prev | Next | All | Image | This Release | Search