/AL QAIM SUPERPHOSPHATE FTLZR PLNT/[   (b)(1) sec 1.3(a)(4)   
]/CTY:IZ/N//

Filename:3913567
GENDATE:         950718
NNNN
TEXT:            
ENVELOPE OAAMCIAA YHLADN 3504 0392025-MXOL--YEKDQX.
ZNY MMXOL
ZKZK OO AAZ DE
HEADER O 082024Z FEB 91



[   (b)(1) sec 1.3(a)(4)   ]


Subject:  /AL QAIM SUPERPHOSPHATE FTLZR PLNT/[   (b)(1) sec 
1.3(a)(4)   ]/CTY:IZ/N//
LOC/[   (b)(1) sec 1.3(a)(4)   ]

RMK
/BE: [   (b)(1) sec 1.3(a)(4)   ]
/OBJECTIVE: [   (b)(1) sec 1.3(a)(4)   ]
/WEAPONS PLANNED: [   (b)(1) sec 1.3(a)(4)   ]
/WEAPONS EXPENDED: [   (b)(1) sec 1.3(a)(4)   ]
/AIMPOINT:
/GRID REF: BTG GRID LOC: 
/PHYSICAL DAMAGE ACHIEVED:
/(A) 1 (B) UNK
/(C) MOD (D) CONF
/(E) APPROXIMATELY 50 ADDITIONAL CRATERS ARE [   (b)(1) sec 
1.3(a)(4)   ] IN THE SW
/CORNER OF THE FACILITY SINCE 05 FEB 91. THE TWO RAIL SPURS BOTH
/[   (b)(1) sec 1.3(a)(4)   ] SEVERED IN TWO PLACES BY CRATERS.
/OPTIMAL REPAIR-REPLACE: REPAIR
/BEST ASSESSED REPAIR-REPLACE: 1-3 DAYS
/BEST ASSESSED RATIONALE: RAIL LINES WILL BE BACKED UP UNTIL RAIL
/SPURS ARE REPAIRED.
/FUNCTIONAL DAMAGE ON THE INSTALLATION [   (b)(1) sec 1.3(a)(4)   
]: THIS MOST RECENT
/STRIKE PRODUCED NO DAMAGE TO THE INSTALLATION AND CREATED ONLY
/COLLATERAL DAMAGE, THAT BEING TO THE RAIL SERVICE LINES. FACILITY
/IS STILL OPERATIONAL.
/MISSION ASSESSMENT: [   (b)(1) sec 1.3(a)(4)   ]