Document Page: First | Prev | Next | All | Image | This Release | Search
File: 950925_3913567.txt/AL QAIM SUPERPHOSPHATE FTLZR PLNT/[ (b)(1) sec 1.3(a)(4) ]/CTY:IZ/N// Filename:3913567 GENDATE: 950718 NNNN TEXT: ENVELOPE OAAMCIAA YHLADN 3504 0392025-MXOL--YEKDQX. ZNY MMXOL ZKZK OO AAZ DE HEADER O 082024Z FEB 91 [ (b)(1) sec 1.3(a)(4) ] Subject: /AL QAIM SUPERPHOSPHATE FTLZR PLNT/[ (b)(1) sec 1.3(a)(4) ]/CTY:IZ/N// LOC/[ (b)(1) sec 1.3(a)(4) ] RMK /BE: [ (b)(1) sec 1.3(a)(4) ] /OBJECTIVE: [ (b)(1) sec 1.3(a)(4) ] /WEAPONS PLANNED: [ (b)(1) sec 1.3(a)(4) ] /WEAPONS EXPENDED: [ (b)(1) sec 1.3(a)(4) ] /AIMPOINT: /GRID REF: BTG GRID LOC: /PHYSICAL DAMAGE ACHIEVED: /(A) 1 (B) UNK /(C) MOD (D) CONF /(E) APPROXIMATELY 50 ADDITIONAL CRATERS ARE [ (b)(1) sec 1.3(a)(4) ] IN THE SW /CORNER OF THE FACILITY SINCE 05 FEB 91. THE TWO RAIL SPURS BOTH /[ (b)(1) sec 1.3(a)(4) ] SEVERED IN TWO PLACES BY CRATERS. /OPTIMAL REPAIR-REPLACE: REPAIR /BEST ASSESSED REPAIR-REPLACE: 1-3 DAYS /BEST ASSESSED RATIONALE: RAIL LINES WILL BE BACKED UP UNTIL RAIL /SPURS ARE REPAIRED. /FUNCTIONAL DAMAGE ON THE INSTALLATION [ (b)(1) sec 1.3(a)(4) ]: THIS MOST RECENT /STRIKE PRODUCED NO DAMAGE TO THE INSTALLATION AND CREATED ONLY /COLLATERAL DAMAGE, THAT BEING TO THE RAIL SERVICE LINES. FACILITY /IS STILL OPERATIONAL. /MISSION ASSESSMENT: [ (b)(1) sec 1.3(a)(4) ] /ANALYST REFERENCE: [ (b)(1) sec 1.3(a)(4) ], [ (b)(2) ][ (b)(6) ]
Document Page: First | Prev | Next | All | Image | This Release | Search