Document Page: First | Prev | Next | All | Image | This Release | Search
File: doc17_09.txt
ANNEX F
(Decontamination Operations) to Operation Desert Storm NBC SOP
1. Personnel Decontamination.
a. Personnel decontamination will initially be limited to
individual decontamination procedures. Personnel will continue
to perform their mission in MOPP 4 ani perform MOPP gear exchange
lAW ANNEX C if necessary.
b. If the command displaces out of Riyadh, CCHC will
establish a decontamination site outside of the city (for larid
evacuation) or prior to the airfield (for air evacuation).
2. Equipment Decontamination.
a. Equipment decontamination wiLl initially be limited to
operator decontamination procedures. `~pe.rators will report to
CCHC NBC Room to draw Mli Decon Apparc~tu~es and DS2.
b. Weathering will be the primary irethod of
decontamination.
c. Priority for equipment decontamination is:
* Vehicles to support CINC.
* CCHC TOE vehicles.
* Buses.
* Exposed communications equlpnient.
d. If the command displaces out of Riyadh, CCHC will
establish a decontamination site outside o~ the city (for land
evacuation) or prior to the airfield (for air evacuation).
FOR ~~ri~iAL U~L~ ~~I~
BE~fl~GY t~ CI~~~IflL~ ~y~1~~ i E
12
DOWNGRADED FOR RELEASE 12 JAN 96
USCENTC0M HQcc
Document Page: First | Prev | Next | All | Image | This Release | Search