                  (8) (A    Report status of all bulk water supply points to
         CMMC/MMT.
                  (9) d) Immediately report the grid location of all
         possible water wells with their anticipated production capability
         to the cmmclw4T.
                  (10) (40   Provide battle damage reports to CMMC/MMT as
         soon as possible.                     I

                  (11) (AW   Issue potable water at a rate of 4.9 gallons
         per man per day.

                  (12)  OA   Provide unit distribution of 20k gallons of
         water per day to each hospitals.

                  (13)       Provide daily water equipment status to
         CMMC/MMT.

                  (14)       Deploy with all water hauling assets filled.

              b.       44th MED 13DE: At Phase II D+l and throughout Phase
         III. provide preventive medicine (PM) teams to all IST COSCOM
         CSGs/CSBs for the purpose of water certification/testing.

              C. (U) 46th CSG-


                  (1) (U) PHASE II:
                       (a)  X) Pi;6vide line haul delivery of bulk water to
         the 82d DIV. 3rd ACR and ail nondivisional units located in the
         46TH CSG area of responsibility (Logbase WHISKEY and AO Cactus).

                       (b)       Within 12 hours of arrival in TAA. set up
         a retail water point along Tapline Road in the vicinity of Logbase
         WHISKEY and AO Cactus. These water points will fill containers of
         400 gallons and less. Ensure traffic can clear the road.

                  (2) (U) PHASE III:

                       (a)       Deploy bulk water production equipment
         (ROWPUS) to establish bulk water points to support 82d ABN Div and
         the 3rd ACR.

                       (b)       Provide water support (unit distribution)
         to the 82d ABN Div, 3rd ACR, and accompanying nondivigional units.

              d. (U) 101st CSO:


                  (1) (U) PHASE  II:
 line haul delivery of bulk water to
         the 10lat AASLT DIV. Oth French Div. and all non-divigional units


                                  UNCLASSIFIED

                                      D-3-2

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 117 f:/Week-15/BX000040/OPERATIONS PLANNING FILES JAN-MAY 91 1 OF 2/1st coscom operation order desert storm:12269616083622
Control Fields 17
File Room = apr96_declassified
File Cabinet = Week-15
Box ID = BX000040
Unit = XVIII CORPS
Parent Organization = ARCENT
Folder Title = OPERATIONS PLANNING FILES JAN-MAY 91 1 OF 2
Folder Seq # = 60
Subject = 1ST COSCOM OPERATION ORDER DESERT STORM
Document Seq # = 5
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 26-DEC-1996