                                       JULLS LONG REPORT


            1. (U) JULLS NUMBER: 40257-21841 (00325), submitted by RILEY
            AFZN-DE, COL Whitfield, 856-3906, (913)239-3906.

            2. (U) Operation DESERT SHIELD conducted by USCENTCOM an 02/20/91.

            3. (U) KEYWORDS, EXEC SUM.

            4. (U) TITLE: SUMMARY - Phase I - Director of Engineering & Hsg

            5. (U) EXECUTIVE SUMMARY FOR DIRECTOR OF ENGINEERING AND
            HOUSING:


                  a. Overall the deployment went very well. Even so, there
            were a few problems.

                           (1) There was a lack of information about the
            amount of BBPCT&S material the DEH should stock, and the
            waste of material, especially conex inserts, also was a
            concern. Units reported with insufficient transportation assets
            to move.BBPCT&S material.


                           (2) Deploying units unexpectedly turned in an
            extraordinary amount of material to the Hazardous Material
            Turn-in Point. The large quantities and lack of labeling
            provided logistical problems.

                           (3) Departing units often turned off all the circuit
            breakers in their buildings, which turned off the heat. This
            caused the pipes to freeze and break when the weather turned
            cold.

                           (4) Not all housing occupants leaving post +or an
            extended time notified the housing office. This has created
            problems gaining access to quarters to do maintenance and repair
            work.



                 (U) SUBJECT. NONE


                 (U) INTEROPERABILITY: NONE

                 (U) Action managed by: LOCAL, action worked by:       RAP number:
                 Lesson distributed by: LOCAL.













                            UNCLASSIFIED

                                            II-23

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 517 f:/Week-26/BX001008/DESERT STORM AFTER ACTION REPORTS/special information for installation after actio:12179611150511
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001008
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = DESERT STORM AFTER ACTION REPORTS
Folder Seq # = 11
Subject = SPECIAL INFORMATION FOR INSTALLATION AFTER ACTIO
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996