Document Page: First | Prev | Next | All | Image | This Release | Search

File: 092496_sep96_decls1_0005.txt
Page: 0005
Total Pages: 35

Subject: 7TH ENG BDE OPLAN 5 90                                          

Unit: VII CORPS   

Parent Organization: ARCENT      

Box ID: BX000244

Folder Title: 7 ENGINEERING BRIGADE OPORDS - OPLANS                                                           

Document Number:          7

Folder SEQ  #:          1


                                    UNCLASSIFIED
                                    sEr.ur=T
                                           VI l@IL
           7TH ENGINEER BRIGADE OPLAN 1-90

                    (2) Be prepared to conduct operations in a chemical and
           biological environment.

                   (3) Be prepared to:

                         (a) construct ammunition supply points.

                         (b) plan to upgrade construct and maintain assault
           airstrips.

                         (c) construct terminal petroleum terminals and
           petroleum transfer points.

                         (d)   construct and maintain hc?l@pads for corps
           aviation assets.


                         (e)   construct and maintain FARP'S.


                         (+)   upgrade, expand, ind maintkin current MSR'S.

                         (g)   construct ind maintain new MSR's in the corps
           sector.


                         (h)   construct corps EPW camps.
           support areas. (i)  construct logistic brse camps and 5000 man life

                         (j)   construct survivability positions -For the
           brigade and corps   CP's.

                    (4) Report location of construction materials and
           equipment to the brigade S-3 by the most expeditious means
           available.


                    (5) Be prepared to conduct training briefing in the
           TAA'S, follow the Brigade Command Training Guidance. Briefing
           times to be determined.


                    (6) Develop Rnd execute sleep cycle as a minimum 6 hours
           of continuous sleep daily +or each soldier.

                    (7) Submit reports in accordance with 7th Engr Bde FSOP
           dated 19 Nov 90, reporting -sequence starts upon arrival in TAA.

           4. SERVICE SUPPORT:

                  a. Concept of Logistic Support ANNEX D (Logistics)

                  b. Classes of Supply. ANNEX D (Logistics)

NNEX H (Maintenance)





                                       FIED
                              UN?&I'j

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 35 f:/Week-36/BX000244/7 ENGINEERING BRIGADE OPORDS - OPLANS/7th eng bde oplan 5 90:09209615581730
Control Fields 17
File Room = sep96_declassified
File Cabinet = Week-36
Box ID = BX000244
Unit = VII CORPS
Parent Organization = ARCENT
Folder Title = 7 ENGINEERING BRIGADE OPORDS - OPLANS
Folder Seq # = 1
Subject = 7TH ENG BDE OPLAN 5 90
Document Seq # = 30
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 20-SEP-1996