                  k. No supplies were received this last week due to CID
                  investigation. EAC units are being told that they will not
                  be issued DCUs until they redeploy.

                  1. Mr. Munos left for some dairy inspection work at Dharhan
                  on 27 March 1991.

                  M. COL Wesson made four supervisory visits to the Hafr al
                  Batin Host Nation Warehouse and the EPW camps. Talked      to
                  both EPW camp commanders 29 March 1991. They both
                  (independent of each other) are negotiating Saudi take     over
                  of the facilities. The 301st EPW camp does not expect      to
                  complete the transfer in less than 30 days. The 402nd      EPW
                  camp hopes to complete the transfer within two weeks.      The
                  Saudis appear to be stalling until the end of Ramadan. At
                  the 402nd EPW camp there have been numerous disturbances
                  this last week. The EPWs want hot food, more water, and
                  food during the day in apparent violation of Ramadan Fasting
                  customs.

                  n. COL Wesson made one supervisory visit to the Host Nation
                  Warehouse at KKMC this week

                  0. MAJ Shiller and/or SSG Chichester visited the 1012th GSU
                  twice, the Host Nation Warehouse at KKMC four times, and the
                  Hafr al  Batin warehouse and EPW camps once.

                  p. The   following reports are being worked on this last
                  week.
                       1)  EERS, OERs
                       2)  Field SoPs
                       3)  Lessons Learned
                       4)  Command Reports
                       5)  March 2651 reports

                  q. Vehicle #9 is still down and awaiting transfer of a
                  transmission.

                  r. One generator is still down. Repair will be made of
                possible.

                  S. SPC Snowden went on the Love Boat. SGT Dixon, the
                  alternate, was unable to obtain a slot. Plans are being
                  made to obtain slots for the 422nd.




             2. PLANS SUMMARY FOR NEXT WEEK.'

                  a. Continue working on reports listed in "p." above.

                  b. Continue working on redeployment issue.

                  C. Continue checking equipment which is deadlined.

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 3 f:/Week-34/BX005153/HISTORY REPORT 423RD MED DET/422nd med det maj sig activities last wk 29 mar :09209615582543
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-34
Box ID = BX005153
Unit = 22D SUPCOM
Parent Organization = ARCENT
Folder Title = HISTORY REPORT 423RD MED DET
Folder Seq # = 36
Subject = 422ND MED DET MAJ SIG ACTIVITIES LAST WK 29 MAR
Document Seq # = 43
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 20-SEP-1996