Document Page: First | Prev | Next | All | Image | This Release | Search

File: 092396_jul96_decls13_0003.txt
Page: 0003
Total Pages: 8

Subject: V CORPS OPLAN 90 9 DEPLYMT OF 12TH AVN BDE TO DES SHLD          

Box  ID: BX001303

Document Number:          3

Folder Title: OPERATIONS PLANNING FILES 3D AMD DIV DSS 91                                                     

Folder Seq #:         41

Unit: 3D AD       

Parent Organzation: VII  CORPS  


                              UNCLASSIFIED



       DUCT COISAT OPERATIONS UPON ARRIVAL.

                 8) (U) RECEIVE 3-22?TH AVH SH AND 4 PLT, D STRY, 3-5
    ADA SR (STINGER) FROM 3RD ARMD DIV ATTACHEO.
                 C) (U) RECEIVE AiP8-l35 (AVIM)(+) AND 95TH CHE?I CO
    FROM 3D COSCOH ATTACHED.
                 D) (U) COORDINATE WITH 302HO MCC FOR MARCH CREDITS AND
    MOVEMENT OF HAZARDOUS/OVERSIZED CARGO.
                 E) (U) COORDINATE WITH ISTH MP SOE FOR TCP SUPPORT.
            2) (U) 3RD AR14D DIV. ATTACH 3-227T)i AVH SH WITH 4 PLT, D
    STRY, 3-5 ADA OH (STINGER) TO 12AB.
            3) (U) 3RD COSCOM.
                 A) (U) ATTACH A/8-15& (AVIM)(+) AND 95TH CHEli CO (-) TO
    12TH AYN BDE.
                 8) (U) PROVIDE SUPPORT AS REQUIRED.
                 C)     IF REQUIRED, ASSIST IN TRANSPORTING UBL TO
    APOE .
                 0)     PROVIDE DEPARTURE AIRFIELD(S) SUPPORT TO
    INCLUDE REFUELING, DEFUELING, AND DESERT UNIFORM issue.




    PAGE 06 RHFFAAAD473
                (U) ISTH MP BDE. COORDINATE AND BE PREPARED TO PROVIDE
    TCP SUPPORT, AS REQUIRED.
            4)  (U) STH PERS GRP. SUPPORT POR AS REQUIRED.
            3)  (U) 5T@ FIN GRP. SUPPORT POR AS REQUIRED.
            (o) (U) 5132 MCC.
                 A) (U) ENSURE ALL ROUTES ARE CLEARED FOR
   IRRYEIGHT/OVERSIZE VEHICLES AND RESTRICTIONS TO TRAFFIC FLOW.
                 8) (U> COORDINATE MP SUPPORT FOR ROUTE CLEARANCE AND
    TCP'S, AS REQUIRED.
                 C) (U) MINIMIZE UNIT MOVEMENT DURING RUSH HOUR TRAFFIC
    CONSISTENT WITH MISSION REQUIREMENTS.
            7) (U) COORDINATING INSTRUCTIONS. THIS PLAN IS EFFECTIVE
    FOR PLANNING UPON RECEIPT AND EXECUTION OH ORDER.
                 A)    DEPLOY WHEELED VEHICLE ORG MAINT SUPPORT.
                 9)     C-DAY, L-HOUR IS a?17aaZ AUG 90.
                 C) (U) PROVIDE DETAILED EQUIPHEHT LIST TO V CORPS CAT
    AND VERIFY JDS EQUIPMENT LIST UPON OEPLOY-AEHT.
                 0) (U) PROVIDE STANDARD HAMrr. LINE OF ALL DEPLOYING
ORPS CAT UPON DEPLOYMENT.
    8 I



















                               UNCLASSIFIED

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 8 f:/Week-28/BX001303/OPERATIONS PLANNING FILES 3D AMD DIV DSS 91/v corps oplan 90 9 deplymt of 12th avn bde to de:0906961515102
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-28
Box ID = BX001303
Unit = 3D AD
Parent Organization = VII CORPS
Folder Title = OPERATIONS PLANNING FILES 3D AMD DIV DSS 91
Folder Seq # = 41
Subject = V CORPS OPLAN 90 9 DEPLYMT OF 12TH AVN BDE TO DE
Document Seq # = 2
Document Date =
Scan Date = 18-JUL-1996
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 06-SEP-1996