Document Page: First | Prev | Next | All | Image | This Release | Search
File: 091896_jun96_decls5_0011.txt
Subject: 7TH ENGINEER BRIGADE DEMOLITION MISSION STATUS
Box ID: BX000252
Document Number: 52
Folder Title: DAILY STAFF JOURNAL 2 MAR TO 15 MAR 1991 SITRREPS
Folder Seq #: 27
Unit: VII CORPS
Parent Organzation: ARCENT
DOZ.[ NU 774rlc)r-
Vic AL
BUSSAYAH
MINEFIELD 2 ROWS TRIANGULAR B]JRIED N-49 54.6
POSSIBLE DECOY (TF16/1>,) ECj45 47.95/
0 OZ:?_
Vic AL
BUSSAYAH
'-@514@J5 MINEFIELD @- ROWS TRIANGULAR BURIED NU 748072
POSSIBLE DECOY (TF16/1>,)
CHEM POSSIBLE MINEFIELD NEAR 6'9TH
NOTE: The aboveir)fot-rnatior-i was cornpii@:i fr,:)mr-epor-ts received
by the
DTAC Engineers (SAPPER OSCAR)
during the period betweet) the LD at-id 280800 FEB 91.
CACHES/EOUIPMENT/BUNKERS
DTCI DESCRIPTION LOCATION
STATUS
28 FEB ARTY AMMO CACHE IN 3.',4 SECTOR @D&ZI @'Ll 1181.90
CDR CONCERNED ABOUT SECONDARY
EXPLOSIIDNS AND CHEM MUNITIONS
(TF WC/3@:)
25 FEB BUNIER COMF'LE:,' (I'FI6/1@,) PU 7844
ALBUSSAYAH
(TF@a4/2X) 2 MILES
NORTH
2.'B FEB LARGE AMMO DUMP 2.5 TONS N30 01.77
SMALL ARMS, ARTY (TF WC/3,) 00@ E47 08.63
-4-8 FEB BUNKER SYSTEM 9 OF EQUIPMENT/ OU 1531
STORES (TF WC/3>:)
-F
4-8 FEB BUNKER COMPLE:-: (I WC/3X) 06 OU 173389
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 17 f:/Week-25/BX000252/DAILY STAFF JOURNAL 2 MAR TO 15 MAR 1991 SITRREPS/7th engineer brigade demolition mission status:09139616131441
Control Fields 17
File Room = jun96_declassified
File Cabinet = Week-25
Box ID = BX000252
Unit = VII CORPS
Parent Organization = ARCENT
Folder Title = DAILY STAFF JOURNAL 2 MAR TO 15 MAR 1991 SITRREPS
Folder Seq # = 27
Subject = 7TH ENGINEER BRIGADE DEMOLITION MISSION STATUS
Document Seq # = 41
Document Date =
Scan Date = 02-JUL-1996
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 13-SEP-1996