Document Page: First | Prev | Next | All | Image | This Release | Search
File: 081296_jul96_decls15_0002.txt
Subject: ANNEX M SERVICE SUPPORT OPLAN 65-91M
Box ID: BX001201
Document Number: 11
Folder Title: ENEMY EQUIPMENT DESTRUCTION REPORTS
Folder Seq #: 104
Unit: 1ST AD
Parent Organzation: VII CORPS
UNCLASSIFIED
ANNEX M (SERVICE SUPPORT) TO IAD OPLAN 65-91M (ATTACK/MOVEMENT TO CONTACT)
(b) (U) Units deploy with 5 DOS MREs and water.
(c) Priority for bulk water is the MASH and
decontamination. Units carry additional water and rations commensurate
with capability.'
(d) (U) Water for cooking and hygiene is not planned for at
least the first 72 hours.
(e) Iraqi tradition is to poison all water sources a$
they withdraw. Under no circumstances will captured water stocks be used
without medical verification of potability.
(f) ROWPUs provide bulk water to fill unit needs upon
locating a suitable source.
(g) (U) MKTs and 94B personnel not designated as truck
drivers will be consolidated under DISCOM control prior to departure from
FAA GARCIA. Assets will be returned to units at the conclusion of PHASE V
of the overall operation, or 0/0 as warranted by the situation.
(2) @ Class II. No change.
(3) (U) Class III.
(a) @ Units carry I DOS III(B) and 15 DOS III(P). Report
critical shortages to DMMC. DMMC consolidates and forwards tg 800th CMMC.
(b) @ Iraq has positioned chemical contaminants - forward.
Expect captured stocks to be heavily contaminated. Contaminants are
highly corrosive to engines. Lab facilities to test for contamination er,
available in TAA BASTOGNE. Do not use prior to testing for contamination.
(a) When bladders have been downloaded in FSA, priority
changes to filling the bladders. Divisional 5000 gal tankers will fill,
in priority, divisional retail and storage assets. When these assets are
ll (including the 50K bladder), fuel should be downloaded into FSSP
bladders vic PYTHON. Divisional 5000 gal tankers will not be used for
fuel storage in division areas during this phase.
(4) (U) Class IV.
(a) (U) Continue to requisition through normal supply
channels.
(b) (U) Push packages will be pushed forward to Brigade
level.
UNCLASSIFIED
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 16 f:/Week-28/BX001201/ENEMY EQUIPMENT DESTRUCTION REPORTS/annex m service support oplan 65-91m:08099611154636
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-28
Box ID = BX001201
Unit = 1ST AD
Parent Organization = VII CORPS
Folder Title = ENEMY EQUIPMENT DESTRUCTION REPORTS
Folder Seq # = 104
Subject = ANNEX M SERVICE SUPPORT OPLAN 65-91M
Document Seq # = 36
Document Date =
Scan Date = 17-JUL-1996
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 09-AUG-1996