Document Page: First | Prev | Next | All | Image | This Release | Search

File: 073096_jun_decls3_0033.txt
Page: 0033
Total Pages: 35

Subject: DAILY COMMANDER SITREP                                          

Box  ID: BX000213

Document Number:          4

Folder Title: SITUATION REPORTS  7TH ENG BDE  22 DEC 90- 10 APR 91                                            

Folder Seq #:          1

Unit: VII CORPS   

Parent Organzation: ARCENT      








             Daily SImR7P 7th Engineer Brigade

             021422C Fl-7B 91
             TO: VTI Corps Cq-3 (op8)

                  a. Situation. '2th Engineer 3attalion attached to 3AD, 54'@h
             and 527'@h Engineer Battalion attached to !AD,

                  b.    Operation8/Tng. Construction:

                        ('I) '@og Base Echo: 100%

                        (9) Is" Cav. Di-v.; Project on schedule


                  e.    Combat Support Equipment Readii-iess           90%


                        Personnel


                            @er5 in             % in               Pers
                         Theater               Theater           in TAA8
                            579-0                 80%             5194


                  g.    Unit Loca'uions:,

                        HHC 7 ENG BDE         PS  439144
                        IJFC 109@lh EiqC- G@  PS  439144
                        HHC 176th EXT(3  GP   NS  560560
                        HHC 926@lh EhTC-,' GP NS  559612

                  h. Problems Requiring Corps Assistance:

                        (1) This brigade feels 'he repackaged overgarment, which
             have passed 'their wear l@ie date, can still serve a very useful
             purpose as either a second or third set. They should not be
             turned @n as unusable.

                        @12) Current distribution ol -,oo8i-@@4,on locators will
             provide this brigade with a fraction of its requirement
             'these a88et@, we wi-11@ be -,nab'-e '@lo nrov4@de effective engineer
             support a,@, ni h'U.

                        (3) r'e--ues'@ update or- 8"-atu8 o' Israeli armored dozers.
             This eqi-,i-,oment is Cri'4Cally important to force preservation
             during breaching operations.

                        (4) 3ri-6,ade needs to -use the                  massive quantity
             of crushed rock at quarries by T@og Base Echo now. Contract
               to support construction ol
             MS@'8, runw ys, and forward stockpiles for '@u'lure operations.

                        (5) Units traversing in our area. continue to disregard
             blackout dr@ve requirements.

             2. POC S-3, 7th Engineer Brigade, 9-7598-312/3!G.

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 35 f:/Week-24/BX000213/SITUATION REPORTS 7TH ENG BDE 22 DEC 90- 10 APR 91/daily commander sitrep:07269614225918
Control Fields 17
File Room = jun96_declassified
File Cabinet = Week-24
Box ID = BX000213
Unit = VII CORPS
Parent Organization = ARCENT
Folder Title = SITUATION REPORTS 7TH ENG BDE 22 DEC 90- 10 APR 91
Folder Seq # = 1
Subject = DAILY COMMANDER SITREP
Document Seq # = 18
Document Date =
Scan Date = 25-JUN-1996
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 26-JUL-1996