            Daily S,ITREP 7th Engineer Brigade

            061500C FEB 91


            TO- VII Corps B-3 xops)

                a. Situation. 109th Engineer Group preparing to move.

                b. Operations/Tng. Combat battalions continue 'La train in
            breaching operations.

                L..  Combat Support Equipment Readiness       90%




                         Pers :L@n        % in            PL-rs
                      Theater            TheRter        in ,-AAs
                         5E366             n@%           5@@46


                g.   Unit,Loc:ations-


                     Hf4C 7 ENO BDE     PS 4@-,9144
                     HHC 109th ENO  BP  PS 43@144
                     HHC 176th ENO  BP  NS 560560
                     HHC 926th ENO  Gn  NS 559612

                h.   Problems Requiring  Corps Assistance:

                     11) Request transportation assets be allocated to
            complete movement a+ 131st CSE Company from port to FAA. Unit is
            critical. to completion a+ Phase T@I construction missions and
            future bberatibns.


                     '%2) Request reevaluation of all current construction
            missions and revision of priorities RS necessary. With current
            assets, Bde will be unable to complete now Log Base Echo
            coristrLkc:@@ion, prepare MSRS, provide survivability to Corps
            artillery units, construct C-!'-,O airfields, train to -conduct
            breaching operations, and concurrently provide survivability and
            counterinability support to I CD.

                     (3) Request assistance in improving CL IX and major
            assembly support for M916/M920 tractors. Bde tractor
            availability is 63% of authorized, as a result of equipment
            shortages (18 tractors) and NM'@ status due to high cross-country
            use. Low tractor availability limits unit5' ability to fully
lity to
            support Corps future operations.

                     (4) Distribution plan for LORAN devices seems to have
            overlooked size of brigade and its front line mission. Current
            plan provides fewer than 2 per company +or units that typically
            perform platoon missions over the entire corps area a+
            operations.

                POC S-3, 7th Engineer Brigade, 9-7598-312/318.

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 35 f:/Week-24/BX000213/SITUATION REPORTS 7TH ENG BDE 22 DEC 90- 10 APR 91/daily commander sitrep:07269614225918
Control Fields 17
File Room = jun96_declassified
File Cabinet = Week-24
Box ID = BX000213
Unit = VII CORPS
Parent Organization = ARCENT
Folder Title = SITUATION REPORTS 7TH ENG BDE 22 DEC 90- 10 APR 91
Folder Seq # = 1
Subject = DAILY COMMANDER SITREP
Document Seq # = 18
Document Date =
Scan Date = 25-JUN-1996
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 26-JUL-1996