Document Page: First | Prev | Next | All | Image | This Release | Search

File: 073096_jun_decls3_0023.txt
Page: 0023
Total Pages: 35

Subject: DAILY COMMANDER SITREP                                          

Box  ID: BX000213

Document Number:          4

Folder Title: SITUATION REPORTS  7TH ENG BDE  22 DEC 90- 10 APR 91                                            

Folder Seq #:          1

Unit: VII CORPS   

Parent Organzation: ARCENT      





                                  UNCLASSIFIED
            Daily SITREP 7th Engineer Brigade

            081500C FEB 91


            TO: VII Corps C-3 (Ops)

                a. Situation. HQ,7th Engineer Brigade prepares to move to
            new location.

                b. Operations/Tng. Combat battalions continue      to train in
            breaching operations.

                e. Combat Support Equipment Readiness       90%

                f. Personnel


                         Per@ in         % in            Pers
                      Theater           Theater        in TAAs
                         5866             80%           5246

                g.   Unit Locations-.

                     HHC 7 ENG BDE     PS 439144 (NS 409681)
                     HHC 109th ENG  GP NS 410790
                     HHC 176th ENG  GP NS 405825
                     HHC 926th ENG  GP NS 559612

                h.   Problems Requiring Corps Assistance:

                     (1) Require@Corps  coordination for transportation assets
            to move  forward two sets of airfield matting.

                     (2) It is time to revise the construction priorities.
            MSRs are currently last priority. Priority changes way be
            warranted by new missions including theater.

                     (3) Lack of night vision goggles remain a critical
            problem in the brigade. NVGs are critical assets for nightime
            engineer operations.

                     t4) Request a r6lo6k of the current LORAN distribution
            plan.It overlooks the size of brigade and its front line mission.
            It provides fewer than 2 per company for units that typically,
            perform platoon missions over the corps area of operations.,

                     (5) Request assignment of a combat heavy battalion or at
            a minimum a combat support equipment company as an interim
            solution to the late arrival of the 527th Engineer Battalion,
o be available until after G Day.

                     (6) Request establishment of theater engineer work line
            at LD effective G Day. Allocation of assets to divisions leaves..
            brigade with insufficient assets to maintain MSRs to@the breach.


                                                       DECLASSIFIED ON 8 Jul 1996 PER SECA Y (DAMH) UP
                                                       SEC 3.4 EO 12958.

                                     UNCLASSIFIED

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 35 f:/Week-24/BX000213/SITUATION REPORTS 7TH ENG BDE 22 DEC 90- 10 APR 91/daily commander sitrep:07269614225918
Control Fields 17
File Room = jun96_declassified
File Cabinet = Week-24
Box ID = BX000213
Unit = VII CORPS
Parent Organization = ARCENT
Folder Title = SITUATION REPORTS 7TH ENG BDE 22 DEC 90- 10 APR 91
Folder Seq # = 1
Subject = DAILY COMMANDER SITREP
Document Seq # = 18
Document Date =
Scan Date = 25-JUN-1996
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 26-JUL-1996