Corporate Interference
During June, T B O'Brien stated that the firefighters were still
waiting for bulldozers, backhoes, cranes, more than 300 trucks
and a host of smaller specialized tools.
He blamed the huge US Bechtel corporation for the delays, stating
that Bechtel were insisting on a long bidding and testing process
before ordering and shipping well-known equipment that could be
had off the shelf in Dubai, just a few miles down the Arabian
Gulf.
Although Bechtel is working as the purchasing agent for the
Kuwaiti oil company it is difficult to understand why it is
insisting on such procedures.
in the main Bechtells role is that of heavy civil engineering and
"downstream" oil engineering such as pipeline and refinery
construction. It does not normally engage in a "hands-on" role
where drilling and firefighting are concerned.
It seems likely that whatever Bechtel is doing, the facts are
very well known to the US administration and the White House.
Bechtel was co-founded by former CIA Director John A McCone and,
in later years, employed both George Schultz and Caspar
Weinberger as President and Vice-President respectively.
The Bottom Line
For the last five months at least, the Kuwaitis have been well
aware of the need for a large number of heavy duty drilling rigs
to drill directional relief wells into the 300 rogue high-
pressure blowouts. Despite this knowledge, none have been put to
work, despite the deteriorating situation.
Internationally, the situation has been confused to a certain
extent with the public perception that the raging fires were the
eption can be changed there is
little chance of a public outcry loud enough to influence the
activities of either Bechtel or the US administration.
Such is the level of confusion that even F081, after their
excellent work in the area, state that "More firefighters must be
trained ... creative ideas for extinguishing oil fires being
advanced by top university personnel should be tested and put in
place."
The only way the 300 rogue blowouts can be cured is by cutting
off the pressure deep underground with directional relief wells.
It is the only route to environmental salvation. If action is not
taken very swiftly to move a large number of! rigs into the high-
pressure fields, this final solution may also be denied.
*Joe vialls is an oil project consultant with almost 20 years
experience at the sharp end of the oil and gas exploration
industry.
Box ID = BX000000
Unit = CONST ENG LABS
Parent Organization = ;CORPS OF ENGS
Folder Title = SMITH PAPERS POST GULF WAR RECOVERY
Subject = Gulf oil catastrophe critical
Document Number = 92
Image file name = 00000023.tif
Document Page: First | Prev | Next | All | Image | This Release | Search