Document Page: First | Prev | Next | All | Image | This Release | Search

File: 970606_aadem_06.txt
Page: 06
Total Pages: 15

ARAC Computer Simulation Notes
Integ. Air Conc.
Generated:    5OCT90 1527  Z

Rernarks: Calc #1 (close - in 10 km)
                 100 kg release
                 10 min burn
                 493 m high x 108 m wide

Integrated at                 1.5 m
04OCT90   0000  Z  to  04OCT90 0800 Z

Material:  Generic

Contours:
(Level and Area Covered)
[XXX]  >            1.00E+02             mg-s/m3
Area Covers                                    3.36 sq km
[------] >            1.00E+01              mg-s/m3
Area Covers                                    115.86 sq km
[/ / / /]  >            1.00E+00               mg-s/m3
Areas Covers                                   367.04 sq krn
[\ \ \ \] >             1.00E-01                mg-s/m3
Area Covers                                    477.05 sq km
[ l l l l] >             1.001E-02              mg-s/m3
Area Covers                                    553.14 sq km

1.0 km

1.0 mi


Document Page: First | Prev | Next | All | Image | This Release | Search