Document Page: First | Prev | Next | All | Image | This Release | Search
File: aabbc_02.txt
PAGE 3 RHDIAAA6455
48TFW 20 F-111F 15 JAN 29 NOV
37TFW 18 F-117 15 JAN 2 DEC [(b)(1) sec 3.4(b)(5)]
72BTCS 1 CRC 15 JAN 5 DEC
USAFE 1 MPC 15 JAN 5 DEC
48TFW 12 F-111F 15 JAN 11 DEC
36TFW 24 F-15C 15 JAN 28 DEC
4TFW 24 F-15E 15 JAN 3 JAN
52TFW 12 F-4G 15 JAN 3 JAN
TBD(2) 24 F-16 15 JAN 5 JAN
TBD(2) 18 F/A-16 15 JAN 7 JAN
67TRW 12 RF-4C 15 JAN 10 JAN
TBD(2) 18 A-10 30 JAN 15 JAN
USAFE 18 A-10 30 JAN 23 JAN
8 ASOC 1 ASOC 15 JAN TBD
552AWACW 4 E-3 ON CALL TBD
37TFW 6 F-117 ON CALL TBD [(b)(1) sec 3.4 (b)(5)]
347TFW 24 F-16 ON CALL TBD
USAFE 24 F-16 ON CALL TBD
NOTE 1: PROPOSED DEPLOYMENT/CLOSURE DATES AND BEDDOWN LOCATIONS
PENDING USCENTCOM CONCURRENCE.
PAGE 4 RHDIAAA6455
NOTE 2: PENDINCG CALL-UP.
NOTE 3: OH CALL UHITS MUST CLOSE IN A-OR WITHIN [(b)(1) sec 3.4(b)(5)]
NOTIFICATION.
2. (U) COORDINATING INSTRUCTIONS.
A. (U) ANTICIPATED LENGTH OF OPERATION: TBD.
B. (U) C-DAY/L-HOUR: 071700Z AUG 90.
C. (U) CODE NAME FOR OPERATION IS: DESERT SHIELD.
3. (U) UNITS SHOULD PLAN TO DEPLOY WITH APPROPRIATE MISSION ORIENTED
PROTECTIVE POSTURE (MOPP) GEAR.
4. (U) TAC UNITS WILL CIT UNIT FUNDS WITH ESP CODE VA (VICTOR ALPHA)
TO TRACK ALL COSTS FOR AFTER THE FACTI FUNDING.
5. LOGISTICS AND ADMINISTRATION.
A. THE TCS FOR EACH DEPLOYING UNIT ARE CONTAINED IN [(b)(1) sec 3.4 (b)(5)]
SK.
B. (U) AIRLIFT MOVEMENT PRIORITY. lB1.
C. (U) USE THE FOLLOWING LOAD PLANNING FACTORS FOR AIRCRAFT:
C-141 - 22.5 SHORT TONS (ST)
C-5 - 7D ST
D. {U) UHIT LOAD PLANNERS SHOULD EHSURE THAT THEIR AVIATION SUPPORT
PACKAGE INCLUDES AN AIRCRAFT LOAD DESlGNATED AS AN ENROUTE SUPPORT
PAGE 5 RHDIAAA6455
TEAM AIRCRAfT (ESTA). ESTAS WILL BE PROVIDED AS PRIORITIES AND
RLIFT ASSETS ALLOW. ENSURE THE ESTA 1S LOAD PLANNED FOR A FULL
AIRCRAFT LOAD IAW SPECIFIED PLANNING FACTORS, I.E. 22.5 SHORT TONS
FOR A C-141 (CARGO AND PAX).
Document Page: First | Prev | Next | All | Image | This Release | Search