Document Page: First | Prev | Next | All | Image | This Release | Search
File: aaayr_07.txt
PRIORITY
BASE COMMUNICATIONS CENTER
390 COSQ/DONA
PAGE 07 OF 12 RHIUFOA 0337 08/1447Z
5330-00-171-4863 03610020 03642544 2 BA 1019 SCI
MICAP5 WITH STATUS CODE IG THAT HAVE BAD STATUS (FB4815)
NSN DOC REQ QTY STATUS
1680-01-087-1011 10340037 1034A014 10 BB 1036 FPZ
2920-03-640-7547 10080058 1009A006 1 BA 1022 DWF
6140-00-822-0397 03440050 03441642 1 MODE A S9G 1003
BAD STATUS INCLUDES THOSE PARTS WITH GOOD" STATUS OR SHIPPING MODES
BUT WITH STATUS DATES IN EXCESS OF 14 DAYS. ALSO, ANY DOCUMENT WITH
AN EDD GREATER THAN 14 DAYS OF THE CURRENT DATE ARE CONSIDERED AS BAD
STATUS.
4. ENGINEERING AND SERVICES:
A. PER CENTAF/LG, 291449 JAN 91 MSG, STATUS IS:
1. (2) 200KW POwER DISTRIBUTION PANELS ARE BEING SOURCED BY
CENTAF/DE.
2. (13) SELF CONTAINED BREATHING APPARTUS ARE BEING SOURCED BY
CENTAF~DE. .
B. NEW REQUIREMENTS
1. (4) WRSK KITS FOR THE (4) P-19'S ON HAND
2. {1) AIRCRAFT SKIN PENETRATER
3. AIRFIELD SWEEPER PARTS - WE NEED PARTS FOR OUR AIRFIELD SWEEPER.
FOD IS A MAJOR PROBLEM HERE AND NEITHER THE RSAF NOR AIRPORT -
AUTHORITIES CAN KEEP UP WITH THE PROBLEM OUR ONLY SWEEPER IS A
CRUCIAL PIECE OF EQUIPMENT AND IT IS NEARLY VDP. WE REQUIRE
IMMEDIATE REPLACEMENT PARTS FOR SKID PLATES, HOSES, AND CURTAINS 1701
SW/LOS HAS ORDERED THE PARTS FOR US. (ORDER #348CE FEB 1, 91 NO'S
57-66) ANY SUPPORT TO OBTAIN THE PARTS WOULD BE APPRECIATED.
4. AIRFIELD SWEEPER - IN ADDITION TO THE SWEEPER PARTS MENTIONED
ABOVE WE REQUIRE ANOTHER AIRFIELD SWEEPER. OUR SWEEPER CAN NOT KEEP
UP WITH THE DEMAND EVEN AFTER IT IS REPAIRED. WE REQUIRE ANOTHER
SWEEPER, TYMCO MODEL 600.
5. ALL TERRAIN FORKLIFT (10K) - NONE ARE AVAILABLE AT OUR LOCATION,
WE HAVE TRIED EVERY SOURCE (MILITARY AND LOCAL) BUT CANNOT FIND ONE.
WITHOUT THIS FORKLIFT OUR MISSION IS SEVERLY HAMPERED. REQUEST
SUPPORT TO OBTAIN THIS ITEM.
C. FIREFIGHTING CAPABILITY
1. VEHICLE STATUS
(4) P-19'S IN FULL SERVICE
(1) P-13 IN FULL SERVICE
(1) P-20 IN FULL SERVICE
{1) P-4 IN FULL SERVICE
(1) P-10 IN FULL SERVICE
2. AGENT COUNT ON HAND
5600 LBS HALON
2760 GALLONS AFFF
3200 LSS DRY CHEMICAL (SOURCING 700 LSS LOCALLY)
3. PERSONNEL ON HAND: 49 FIREMEN WORKING 24 HR SHIFTS
D. DEMIN WATER STATUS
1. WE HAVE 190,000 GALLONS OF DEMIN WATER STORED.
WE RECEIVED THE ADDITIONAL DEMIN PLANT 4 FEB 91, AND ARE PROCEEDING
WITH HOOK-UP.
E. EXPANDED WEAPONS STORAGE AREA (WSA)
THE MOST RECENT EXPANSION OF OUR WSA WHICH WE'RE CALLING PHASE III
WAS COMPLETED 31 JAN 91. MMS IS USING ALL THE BAYS, ROADS, AND THE
BUILD UP PAD. WE HAVE BEEN ASKED TO EXPAND THE WSA ONCE AGAIN.
WE WILL BUILD EIGHT (8) MORE BAYS PLUS ROADS AND BERMS. THIS IS
PHASE IV. (NOTE: WE CURRENTLY HAVE 29 BAYS. PHASE IV WILL GIVE US
A TOTAL OF 37 BAYS. OUR ORIGINAL REQUIREMENT IN OCTOBER 90 WAS FOR
TEN (10) BAYS.
F. AIRFIELD CRACKING
1. WE HAVE STARTED TO NOTICE CRACKING AND SPALLING OF AIRFIELD
SURFACES. WE'VE DONE A SURVEY AND IDENTIFIED THE PROBLEMS IN
PRIORITY ORDER. THE BIGGEST PROBLEMS ARE ON TAXIWAY L, TAXIWAYS Ml
AND M2 (THESE ENTER INTO AND EXIT FROM APRON 12) AND THE MAIN TAXIWAY
L INF ON APRON 12. WE FEEL MANY OF THESE CRACKS EXISTED [(b)(1) sec 3.4 (b)(5)]
BUT HAVE BEEN ACCELERATED BY THE AIRPLANE. IN SOME CASE,
HOWEVER, OTHER CRACKS HAVE BEEN CAUSED BY THE [(b)(l) sec 3.4(b)(5)]
BT
#0342
NNNN
Document Page: First | Prev | Next | All | Image | This Release | Search