USCENTAF/DE

CRITICAL EQUIPMENT STATUS - RAPID RUNWAY REPAIR

		PRIMARY 	THREAT
LOCATION	AIRCRAFT 	PRIORITY	STATUS 	LIMFACS/COMMENTS

AL AYN 	C-130
AL DHAFRA 	F-16
AL RHARJ
AL MINHAD 	F-16
BATEEN	C-130
CAIRO		KC-135
DHAHRAN	F-15		4		UNSAT 	SEE NOTE 1
DOHA		F-16		3		UNSAT	SEE NOTE 2
JEDDAH	KC-135
[(b)(l)sec3.4(b)(5)]
K. FAHD	A-10		1		UNSAT 	SEE NOTE 3
KHALID	KC-135		
MASIRAH	C-130
RIYADH	E-3A
SEEB		KC-135
SHAIKH ISA 	F-4G			2	UNSAT 	SEE NOTE 4
SHARJAH 	C-130
TABUK 	F-15			5	UNSAT 	SEE NOTE 5
TAIF		F-lll
THUMRAIT 	F-15

NOTE 1:   HEAVY EQUIPMENT SOURCED. LGT IS WORKING SHORTFALLS WITH HQ
	TAC/LGT. AFESC IS WORKING FIBERGLASS MAT TO FILL SHORTFALL OF
	AM-2 MAT SYSTEM. FOUR PATCHES (FIBERGLASS) MAT KIT SHIPPED FROM
	CONUS ON 24 OCT 90 AND ARRIVED AT TABUK. ASSETS BEING MOVED 
	FROM TABUK TO DHAHRAN.

NOTE 2:   LG WORKING SHORTFALL OF VEHICLES FROM CONUS. NO AM-2 MAT 
	SYSTEM AVAILABLE FOR THIS SITE. SITE SCHEDULED FOR NEXT 
	AVAILABLE FIBERGLASS MAT SET CURRENTLY BEING PRODUCED.

NOTE 3:   AM-2 MAT SYSTEM ARRIVED 6 OCT 90. KITS MISSING PARTS. SITE
	PERFORMED A DETAILED INVENTORY AND LISTED SHORTFALLS IN THEIR
	SITREP. NINE INCOMPLETE PATCHES ON SITE BUT HEAVY EQUIPMENT 
	STILL IN TRANSIT. THERE IS STILL A SERIOUS SHORTFALL OF HEAVY 
	EQUIPMENT TO PERFORM RRR.

NOTE 4:   375 BUNDLES AM-2 MAT ON SITE BEING USED TO DISPERSE AIRCRAFT.
	TOW TUBES, RAMPS, ETC., FOR NINE PATCHES ARRIVED 5 OCT 90.
	HEAVY EQUIPMENT SOURCED BUT DUMP TRUCKS CURRENTLY BEING 
	USED AT AL DHAFRA TO BUILD MUNITIONS BERMS. PATCH KITS 
	INVENTORIED AND FOUND TO BE COMPLETE
NOTE 5:   SHORTFALL OF HEAVY EQUIPMENT IDENTIFIED TO LGT. TWO FOLDED
	FIBERGLASS PATCH KITS ARRIVED 6 NOV 90 AND ONE KIT BEING SHIPPED
	TO DHAHRAN.


									AS OF 17 NOV 90
									OPR: [(b)(2)]
	