POWER PLANTS - 750 KW GENERATORS


		ELEC ASSETS 750 KW
LOCATION	FOR POP OF 	IN USE		STATUS 	LIMFACS/COMMENTS

AL AYN	1200		    4 		SAT
AL DHAFRA	2500		    7 		SAT
AL KHARJ	4400		    0 		NOT RATED 	NOTE 1
AL MINHAD	950		    3		MAR		NOTE 2
BATEEN	1100		    3		SAT
CAIRO		1100		    3		SAT
DHAHRAN	1200		    2		MAR		NOTE 3
DOHA		1000		    3		SAT
JEDDAH	     0		    0		MAR		NOTE 4
KHAMIS	     0		    0		SAT		NOT REQUIRED
K. FAHD	4400		    8		SAT		NOTE 5
K. KHALID	  400		    0		MAR		NOTE 6
MASIRAH	1000		    2		SAT
RIYADH	  850		    4		SAT
SEEB		1500		    2		SAT
SHAIKH ISA	1500		    3		MAR		NOTE 7
SHARJAH	  400		    2		SAT
TABUK	     0		    0		SAT		NOT REQUIRED
TAIF		1150		    5		SAT
THUMRAIT	2650		    7		SAT

TOTAL          28730		  58

GOAL:  CONNECT TO COMMERCIAL POWER.  RETAIN ORGANIC ASSETS FOR 
	BACK-UP.

NOTE 1:   AWAITING AIRLIFT TO START BUILDING CAMP FOR 4400 PERSONNEL.  13 
	SOLAR GENERATORS PROGRAMMED FOR THIS SITE.  THIS WILL BE THE 
	FIRST LARGE SCALE USE OF SOLARS IN SWA FOR DESERT SHIELD.

NOTE 2:   SITE BORROWED A HOST NATION FUEL TRUCK TO SUPPLY FUEL TO 
	750'S.   STILL AWAITING FUEL BLADDERS SOURCED BY LG.

NOTE 3:   750KW DIESEL GENERATOR SHIPPED TO THUMRAIT FOR REPAIR OF 
	SEIZED ENGINE.

NOTE 4:  FOUR DIESEL 750'S HELD AT THUMRAIT BY LG TO FILL POTENTIAL 1,500
	POPULATION CAMP. CEMIRT DEPLOYED TO SITE TO HELP DETERMINE 
	ELECTRICA EQUIPMENT REQUIRED TO FILL THEIR NEEDS. CURRENTLY 
	UNABLE TO MEET POWER DEMAND.

Document Page: First | Prev | Next | All | Image | This Release | Search